8.
If you are installing the 4/8, 4/16 or 4/32B SAN Switch, verify that a plenum (an
air duct that attaches to the switch rails, enabling the switch to draw cooler air into
the switch from outside the rack, rather than drawing in heated air from within the
rack.) is preinstalled, as shown in
Figure 15
.
If not installed, see
Installing the Plenum (if required)
, page 49 to install a plenum
on the 4/8, 4/16 or 4/32B SAN Switch.
If not installing one of the devices listed in step 8, go to
Securing the switch to the
outer rails
, page 50 to complete the rack mount procedure.
IO
IO
I
!
25052a
1
2
AT
TE
NT
IO
N:
M
axi
m
um
scre
w le
ng
th
fo
r r
ack
m
ou
ntin
g t
o b
e 5
m
m
or
13/
64 in
.
3
Figure 15 Attaching the inner rails to the 4/8 or 4/16 SAN Switch
1. Plenum
2. SAN Switch
3. Two screws for attaching the plenum
to the rails
!
IOIOI
LNK
SPD
MRO25018b
Figure 16 Attaching the inner rails to the 4/32 or 4/64 SAN Switch
48
Installing and configuring SAN Switches
Содержание AA-RWF3A-TE
Страница 1: ...HP StorageWorks SAN Switch installation guide Part number AA RWF3A TE Fifth edition May 2007 ...
Страница 7: ...Supported HBAs 145 Glossary 147 Index 157 SAN Switch installation guide 7 ...
Страница 10: ...10 ...
Страница 64: ...64 Installing and configuring SAN Switches ...
Страница 90: ...90 Managing SAN Switches ...
Страница 117: ...Japanese notice Korean notices SAN Switch installation guide 117 ...
Страница 146: ...146 SAN Switch technical specifications ...
Страница 156: ...156 Glossary ...