Installing Core Switch 2/64 FRUs
160
Core Switch 2/64 V4.1 Installation Guide
Figure 45: Cable management tray
b. Position and tighten the two screws removed in step 3a.
c.
Arrange the cables through or along the tray as required.
Note:
Routing the power cables out each side of the chassis is recommended.
SHR-2526A
Содержание AA-RS2WC-TE
Страница 12: ...Contents 12 Core Switch 2 64 V4 1 Installation Guide ...
Страница 34: ...Overview 34 Core Switch 2 64 V4 1 Installation Guide ...
Страница 88: ...Installing and Configuring the Core Switch 2 64 88 Core Switch 2 64 V4 1 Installation Guide ...
Страница 168: ...Running Routine Operations 168 Core Switch 2 64 V4 1 Installation Guide ...
Страница 198: ...Technical Specifications 198 Core Switch 2 64 V4 1 Installation Guide ...
Страница 206: ...Regulatory Compliance Notices 206 Core Switch 2 64 V4 1 Installation Guide Taiwanese Notice BSMI EMC Statement Taiwan ...
Страница 207: ...Regulatory Compliance Notices 207 Core Switch 2 64 V4 1 Installation Guide RRL EMC Statement Korea ...
Страница 224: ...Setting Up and Configuring Modems 224 Core Switch 2 64 V4 1 Installation Guide ...