Chapter 6
Removing and Replacing Components
Removing and Replacing Airflow Guides
170
Step 5.
Push in on the release lever to secure the drive in the bay and to ensure that the drive connector is
seated properly.
Figure 6-26 Hard Disk Drive Installation
Step 6.
Lock the hard drives in place by press down on the LOCK lever. Replace the server cover if it was
removed to unlock drives.
Step 7.
Verify the drive replacement and operation by using the system utilities. (See the Utilities chapter
or the
HP Integrity and HP 9000 iLO MP Operations Guide
for additional information.)
•
Use the iLO MP commands to verify operation.
•
Use the BCH commands to verify operation.
•
Use diagnostics provided by the ODE to exercise the newly installed module.
Step 8.
Reset the server to the BCH Service Menu to rescan the hard drives.
Removing and Replacing Airflow Guides
To upgrade, remove, or replace most server components, you must first remove the covers from the server
chassis.
The server has the following airflow guides:
•
The processor airflow guide ensures that the proper volume of air for cooling the processor module power
pods, processor modules, and voltage regulator modules flows over these components.
Содержание 9000 rp3410
Страница 8: ...Contents 8 ...
Страница 57: ...Installing the System Introduction Chapter 3 57 Figure 3 4 HP 9000 rp3410 rp3440 Server Pedestal Mount ...
Страница 100: ...Installing the System Installing Additional Components Chapter 3 100 Figure 3 45 Connecting the Power Pod Cable ...
Страница 128: ...Installing the System Troubleshooting Chapter 3 128 ...
Страница 130: ...Installing the System Troubleshooting Chapter 3 130 ...
Страница 146: ...Chapter 5 Troubleshooting Cleaning Procedures 146 ...
Страница 240: ...Appendix A Replacement Parts Replaceable Parts List 240 ...
Страница 248: ...Appendix B Utilities iLO MP 248 ...
Страница 250: ...Physical and Environmental Specifications Appendix C 250 ...