To reboot the system from Command View VLS:
1.
Verify that any backup or restore operation has completed and that the VLS is idle.
2.
Click the
System
tab.
3.
Select
Chassis
in the navigation tree.
4.
Under
Maintenance Tasks
, select
System Maintenance
.
5.
Select
Restart All Nodes
from the task bar.
Restart Head Wizard
displays.
6.
Select
Yes
to reboot all nodes.
CAUTION:
Rebooting the VLS device places the VLS cartridges back into the same library slots
and tape drives they were in at the time of reboot. To move the cartridges from tape drives back
into the appropriate slots, use
Force Unload
from the task bar visible when you select the tape drive
from the navigation tree.
Powering Off the System
WARNING!
To reduce the risk of personal injury, electric shock, or damage to the
equipment, remove the power cord to remove power from the node before removing the access
panel. The front panel Power On/Standby button does not completely shut off system power.
Portions of the power supply and some internal circuitry remain active until AC power is removed.
To power off the system from the VLS CLI:
1.
Verify that any backup or restore operation has completed and that the VLS is idle.
2.
Initiate a shutdown of the VLS by entering:
shutdownSystem
The primary node will report when it has powered down. Amber system power LEDs indicate
that nodes are in standby mode.
3.
Press the
Power On/Standby
button on any nodes not in standby mode. Amber system power
LEDs indicate that nodes are in standby mode.
4.
If removing the access panel from a node:
a.
Wait until the VLS has completed its shutdown operation, then press the UID LED button
on the front of the node. Blue LEDs illuminate on the front and rear panels of the node.
b.
Go to the back of the rack and locate the node by identifying the illuminated rear UID
LED button.
c.
Unplug the node AC power cords from the power source. The node is now without power.
To power off the system from Command View VLS:
1.
Verify that any backup or restore operation has completed and that the VLS is idle.
2.
Under the System tab, select
Chassis
in the navigation tree.
3.
Under
Maintenance Tasks
, select
System Maintenance
.
4.
Select
Shutdown All Nodes
from the task bar.
Shutdown Head Wizard
displays.
5.
Click
Yes
to shut down all nodes.
6.
If removing the access panel from a node, wait until the VLS has completed its shutdown
operation, then press the UID LED button on the front of the node.
Blue LEDs illuminate on the front and rear panels of the node. Amber system power LEDs
indicate that nodes are in standby mode.
7.
Press the
Power On/Standby
button on any nodes that are not in standby mode.
76
Operation
Содержание 12200
Страница 10: ...Japanese Battery Notice 192 Spanish Battery Notice 193 Glossary 194 Index 199 10 Contents ...
Страница 183: ... Please recycle waste batteries Four in one recycling symbol Taiwanese Notices 183 ...
Страница 185: ...German Laser Notice Italian Laser Notice Japanese Laser Notice Laser Compliance Notices 185 ...
Страница 186: ...Spanish Laser Notice Recycling Notices English Notice Bulgarian Notice Czech Notice 186 Regulatory Compliance Notices ...
Страница 187: ...Danish Notice Dutch Notice Estonian Notice Finnish Notice French Notice Recycling Notices 187 ...
Страница 188: ...German Notice Greek Notice Hungarian Notice Italian Notice Latvian Notice 188 Regulatory Compliance Notices ...
Страница 189: ...Lithuanian Notice Polish Notice Portuguese Notice Romanian Notice Slovak Notice Recycling Notices 189 ...
Страница 191: ...French Battery Notice German Battery Notice Battery Replacement Notices 191 ...
Страница 192: ...Italian Battery Notice Japanese Battery Notice 192 Regulatory Compliance Notices ...
Страница 193: ...Spanish Battery Notice Battery Replacement Notices 193 ...