![background image](http://html1.mh-extra.com/html/hoval/max-3-plus-series/max-3-plus-series_technical-information-and-assembly-instructions_2170730033.webp)
33
4 214 283 / 00
COMMISSIONING
5.4.1 Commissioning
Report
All settings both on boiler and burner will be recorded on
a commissioning report which will be supplied to the cus-
tomers representative.
Fig. 23
5.5
Hand-over to the user/safe-keeping
Obtain from the user a written statement that operating
and maintenance instructions have been explained to
him and he has received the relevant operating instruc-
tions (see page 60 for a standard statement). The system
designer is responsible for providing operating instruc-
tions for the complete system. This technical information/
installation instructions are not to be destroyed after com-
missioning but kept permanently with the system.
Содержание Max-3 plus Series
Страница 8: ...8 4 214 283 00 ASSEMBLY Fig 03 1 4 3a 3 5 5a 5b 5c 2a 2b 2 1a 6...
Страница 12: ...12 4 214 283 00 ASSEMBLY Fig 10 1a 1 2 2a 2b 3 3a 3b 4 5b 5 6 5c 5a...
Страница 16: ...16 4 214 283 00 ASSEMBLY Fig 17 1a 1 2 2a 2b 3 3a 3b 4 5b 5 6 5c 5a...
Страница 18: ...18 4 214 283 00 ASSEMBLY 24 23 22 21 20 11 12 19b 25b 25a 25 17b 17a 18g 19 17 10 9 8 15 16 14 13 Fig 21...
Страница 59: ...59 4 214 283 00...