30
4 214 864 / 02
COMMISSIOnInG
5.4
Venting the gas pipes
§
Observe the relevant regulations while vent-
ing the gas pipes
1. Open the gas stop valve.
2. Vent the gas pipe up to the gas armature.
5.5
Handing over the plant to the operator
The plant installer is responsible for providing
instruction covering the entire plant.
The following steps must be carried out when handing
over the plant:
• Instruction in the operation and upkeep of the plant.
• Handing over of all instructions and documents.
• Providing notice to the operator that these instructions
must always be kept available near the plant.
•
Written confirmation of the instruction.
•
Completion certificate see last page.
Содержание CompactGas
Страница 36: ...36 4 214 864 02 ...
Страница 37: ...37 4 214 864 02 ...