ASSEMbly
2.4.1 Installation of boiler controller
2.4.1.1 boiler controller TopTronic
®
E
15a
15b
15c
15c
15
Fig. 08
!
WARNING
Capillaries must not be folded or kinked
1.
Mount the special screws with nuts (15a, Fig. 08) on
the side wall.
Fig. 09
2. Hook the boiler controller (15) into the side wall with
the recesses for the special screws.
3. Fasten boiler controller with 4 self-tapping screws
Ø 3.5x 6.5 and serrated lock washers (15b).
4. Pull the capillaries with the immersion sensors (16,
Fig. 10) through the opening in the side wall, insert
them into the immersion sleeve (16a) as far as the
stop and fix in position with retaining spring (16b).
16c
16
16a
Fig. 10
5. Plug in the burner plug.
6. Close the boiler controller and screw on (15c, Fig. 08).
Continue fitting the cladding.
2.4.1.2 boiler controller T0.2 / T2.2
15b
15c
15a
15
Fig. 11
!
WARNING
Capillaries must not be folded or kinked
1.
Mount the special screws with nuts (15a, Fig. 11) on
the side wall.
Fig. 12
2. Hook the boiler controller (15) to the special screws.
3. Fasten boiler controller with the self-tapping screws
Ø 3.5 x 6.5 and serrated lock washers (15b).
4. Pull the capillaries with the immersion sensors (16,
Fig. 13) through the opening in the side wall, insert
them into the immersion sleeve (16a) as far as the
stop and fix in position with retaining spring (16b).
16c
16
16a
Fig. 13
5. Plug in the burner plug.
6. Attach cover plate to the boiler controller (15c, Fig.
11) with self-tapping screws ø 3.5 x 6.5 and serrated
lock washers.
Continue fitting the cladding.