background image

A

C

H

TU

N

G

 ! 

/ A

TT

EN

TI

O

N

 ! 

/ A

TT

EN

ZI

O

N

! /

 

  I

ns

ta

lla

tio

nu

r d

ur

ch

 k

on

ze

ss

io

ni

er

te

Fa

ch

m

an

na

ch

 ö

rtl

ic

he

V

or

sc

hr

ift

en

.  

/ L

'in

st

al

la

tio

ne

 d

oi

t ê

tre

 ré

al

is

ée

 q

ue

 p

ar

 u

sp

éc

ia

lis

te

 

co

nc

es

si

on

na

ire

 e

t c

on

fo

rm

ém

en

t a

ux

 p

re

sc

rip

tio

ns

 lo

ca

le

/ I

ns

ta

lla

zi

on

so

lo

 c

on

 d

itt

sp

ec

ia

lli

zz

at

se

co

nd

le

 p

re

sc

riz

io

ni

 lo

ca

li!

 / 

In

st

al

la

tio

ns

 o

nl

be

 c

ar

rie

ou

t b

co

m

pe

te

nt

 p

er

so

ns

In

te

rn

 - 

S

ch

em

N

r.:

D

at

um

 :

10

.0

5.

20

12

S

te

ue

ru

ng

 / 

R

eg

ul

at

io

/ R

eg

ul

at

io

ne

 / 

C

on

tro

l :

U

5.

2

V

O

D

A

B

la

tt 

 2

 / 

3

42

11

19

3-

00

S

H

 ..

.

H

au

pt

sc

ha

lte

r m

it 

m

in

. 3

m

m

 K

on

ta

kt

-

ab

st

an

d,

 a

us

se

rh

al

H

ei

zr

au

m

B

...

G

ef

ah

re

ns

ch

al

te

r B

re

nn

er

 a

us

, a

us

se

rh

al

H

ei

zr

au

m

 (B

ck

en

tfe

rn

en

)

D

K

P

 ..

.P

um

pe

 fü

r H

ei

zk

re

is

 o

hn

M

is

ch

er

S

LP

 ..

.

W

as

se

re

rw

är

m

er

la

de

pu

m

pe

Y

K

1/

2.

.S

te

lla

nt

rie

M

is

ch

er

 1

/2

M

K

1/

2.

.P

um

pe

 M

is

ch

er

kr

ei

1/

2

V

A

...

   

V

ar

ia

bl

er

 A

us

ga

ng

 

S

M

 ..

.

S

rm

el

du

ng

 2

30

V

A

...

A

us

se

nf

üh

le

r

K

...

K

es

se

lfü

hl

er

S

...

W

as

se

re

rw

är

m

er

hl

er

V

F1

/2

..

V

or

la

uf

hl

er

 1

/2

K

V

LF

...

S

ol

ar

hl

er

 (K

ol

le

kt

or

 - 

P

T1

00

0)

K

S

P

F.

..S

ol

ar

hl

er

 (W

as

se

re

rw

är

m

er

 -/

 

P

uf

fe

rs

pe

ic

he

r)

IM

P

 ..

Im

pu

ls

ei

ng

an

S

ol

ar

V

E

1/

2/

3/

4.

.V

ar

ia

bl

er

 E

in

ga

ng

 1

/2

/3

/4

R

S

-T

/R

FF

-T

 ..

. R

au

m

st

at

io

n/

 F

er

nb

ed

ie

nu

ng

 (f

al

ls

 

m

eh

re

re

 G

er

ät

pa

ra

lle

l a

ns

ch

lie

ss

en

)

B

U

S

-T

2B

 ..

. R

eg

el

ge

te

 D

at

en

bu

(T

op

Tr

on

ic

-T

)

Le

ge

nd

:

Y

K

R

 ..

. S

te

lla

nt

rie

R

üc

kl

au

fm

is

ch

er

M

...

 

K

es

se

lk

re

is

pu

m

pe

H

FR

H

ei

zf

ch

en

re

in

ig

un

D

R

 ..

D

re

hr

os

t

H

S

 ..

H

au

pt

sc

hn

ec

ke

D

G

 ..

D

ru

ck

ge

bl

äs

e

S

ZG

 ..

. S

au

gz

ug

ge

bl

äs

e

U

E

-R

L.

.U

m

sc

ha

lte

in

he

it 

R

ec

ht

sl

au

f (

V

or

ra

ts

ra

um

)

U

E

-L

..U

m

sc

ha

lte

in

he

it 

Li

nk

sl

au

f (

V

or

ra

ts

ra

um

)

S

H

 ..

.

M

ai

sw

itc

(is

ol

at

or

), 

ou

ts

id

of

 th

bo

ile

rr

oo

m

 

B

...

E

m

er

ge

nc

of

f -

 b

ur

ne

r, 

ou

ts

id

of

 th

bo

ile

r-

ro

om

 (r

em

ov

br

id

ge

)

D

K

P

 ..

.P

um

fo

r h

ea

tin

cy

cl

w

ith

ou

t m

ix

er

S

LP

 ..

.

C

al

or

ifi

er

 - 

lo

ad

in

pu

m

p

Y

K

1/

2.

. A

ct

ua

to

r m

ix

er

 1

/2

M

K

1/

2.

.P

um

m

ix

in

cy

cl

1/

2

V

A

1/

2/

3.

.V

ar

ia

bl

ex

it 

1/

2/

3

S

M

 ..

.

A

la

rm

 2

30

V

A

...

O

ut

si

de

 s

en

so

r

K

...

B

oi

le

r s

en

so

r

S

...

C

al

or

ifi

er

 h

ea

te

r s

en

so

r

V

F1

/2

.. 

Fl

ow

 s

en

so

r 1

/2

K

V

LF

...

S

ol

ar

 p

an

el

 fl

ow

 s

en

so

r (

P

T1

00

0)

K

S

P

F.

..S

ol

ar

 ta

nk

 s

en

so

r (

ca

lo

rif

ie

r /

 b

uf

fe

r)

IM

P

 ..

.

P

ul

se

 in

pu

t s

ol

ar

V

E

1/

2/

3/

4.

..V

ar

ia

bl

in

pu

t 1

/2

/3

/4

R

S

-T

/R

FF

-T

 ..

.R

oo

m

 s

ta

tio

n,

 re

m

ot

co

nt

ro

l, 

   

 (i

f s

ev

er

al

 u

ni

ts

, p

le

as

co

nn

ec

t i

lin

e)

Le

ge

nd

 :

Y

K

R

 ..

. A

ct

ua

to

r l

ow

 te

m

pe

ra

tu

re

 p

ro

te

ct

io

n

M

...

 

B

oi

le

r c

irc

ui

t p

um

p

H

FR

...

 H

ea

tin

su

rfa

ce

 p

ur

ifi

ca

tio

n

D

R

 ..

R

ot

at

in

gr

at

e

H

S

 ..

M

od

ul

at

in

st

ok

er

D

G

 ..

P

re

ss

ur

fa

n

S

ZG

 ..

. I

nd

uc

ed

-d

ra

ug

ht

 fa

n

 ..

Ig

ni

tio

n

U

E

-L

  S

w

itc

hi

ng

 u

ni

t c

ou

nt

er

cl

oc

kw

is

ro

ta

tio

(s

to

ra

ge

 ro

om

)

P

B

S

o.

..

Fi

ll 

le

ve

l p

el

le

ts

 b

ox

 to

p

P

B

S

u.

..

Fi

ll 

le

ve

l p

el

le

ts

 b

ox

 b

ot

to

m

P

U

 ..

Lo

w

 p

re

ss

ur

sw

itc

h

U

E

-S

2.

 S

w

itc

hi

ng

 u

ni

t S

(s

to

ra

ge

 ro

om

)

U

E

-R

 S

w

itc

hi

ng

 u

ni

t c

lo

ck

w

is

ro

ta

tio

 

(s

to

ra

ge

 ro

om

)

S

TB

 ..

S

af

et

te

m

pe

ra

tu

re

 li

m

ite

r

TK

S

-V

.. 

D

oo

r t

ou

ch

 s

en

si

tiv

sw

itc

st

or

ag

ro

om

 

 (r

em

ov

br

id

ge

)

A

S

T-

V

.. 

E

xt

ra

ct

io

st

or

ag

ro

om

 (s

cr

ew

)

A

S

T-

S

V

.. 

E

xt

ra

ct

io

st

or

ag

ro

om

 (v

ac

uu

m

)

B

...

 

Lo

w

 w

at

er

 p

re

ss

ur

sw

itc

h

O

...

 

La

m

bd

pr

ob

e

B

A

G

 ..

. F

lu

ga

se

ns

or

 (A

FD

)

B

R

...

 F

ur

na

ce

 te

m

pe

ra

tu

re

 s

en

so

r (

A

FD

)

E

S

...

 S

to

ke

r t

em

pe

ra

tu

re

 s

en

so

r (

A

FD

)

E

S

D

U

.. 

R

ot

at

io

m

on

ito

rin

st

ok

er

 (A

FD

)

B

K

 ..

.

B

oi

le

r s

en

so

r (

A

FD

)

B

R

U

 ..

. R

et

ur

se

ns

or

 (A

FD

)

A

FD

(F

A

)..

.A

ut

om

at

ic

 fi

rin

de

vi

ce

 (A

FD

)

S

TB

-E

S

..S

af

et

te

m

pe

ra

tu

re

 li

m

ite

r s

to

ck

er

U

E

-S

 S

w

itc

hi

ng

 u

ni

t S

(s

to

ra

ge

 ro

om

)

...

 

nd

un

g

P

B

S

o.

..F

ül

ls

ta

nd

 P

el

le

ts

bo

ob

en

P

B

S

u.

..F

ül

ls

ta

nd

 P

el

le

ts

bo

un

te

n

P

U

 ..

U

nt

er

dr

uc

ks

ch

al

te

r

U

E

-S

2.

.U

m

sc

ha

lte

in

he

it 

S

(V

or

ra

ts

ra

um

)

S

TB

 ..

S

ic

he

rh

ei

ts

te

m

pe

ra

tu

rb

eg

re

nz

er

TK

S

-V

.. 

rk

on

ta

kt

sc

ha

lte

r V

or

ra

ts

ra

um

 (B

ck

 e

nt

fe

rn

en

)

A

S

T-

V

.. 

A

us

tra

gu

ng

 V

or

ra

ts

ra

um

 (S

ch

ne

ck

)

A

S

T-

S

V

.. 

A

us

tra

gu

ng

 V

or

ra

ts

ra

um

 (S

au

ge

r)

B

...

 

W

as

se

rm

an

ge

ls

ic

he

ru

ng

O

...

 

La

m

bd

as

on

de

B

A

G

 ..

. A

bg

as

hl

er

 (F

A

)

B

R

...

 F

eu

er

ra

um

hl

er

 (F

A

)

E

S

...

 F

üh

le

r E

in

sc

hu

bs

ch

ne

ck

(F

A

)

E

S

D

U

 ..

D

re

h-

üb

er

w

ac

hu

ng

 E

in

sc

hu

b-

sc

hn

ec

ke

 (F

A

)

B

K

 ..

K

es

se

lfü

hl

er

 (F

A

)

B

R

U

 ..

. R

üc

kl

au

ffü

hl

er

 (F

A

)

R

A

S

. .

.. 

U

nt

er

dr

uc

A

us

tra

gu

ng

 V

or

ra

ts

ra

um

 

(B

ck

en

tfe

rn

en

)

S

TB

-E

S

..S

ic

he

rh

ei

ts

te

m

pe

ra

tu

rb

eg

re

nz

er

 

 E

in

sc

hu

bs

ch

ne

ck

e

U

E

-S

1.

.U

m

sc

ha

lte

in

he

it 

S

(V

or

ra

ts

ra

um

)

D

G

-P

W

M

 ..

.P

ul

sw

ei

te

nm

od

ul

at

io

D

G

B

LO

C

K

 ..

.B

lo

ck

ie

ru

ng

ss

ch

al

te

r

R

A

S

...

..L

ow

 p

re

ss

ur

sw

itc

ex

tra

ct

io

tu

rb

in

 

(r

em

ov

br

id

ge

)

D

G

-P

W

M

 ..

.P

ul

se

-w

id

th

 m

od

ul

at

io

pr

es

su

re

 fa

n

B

LO

C

K

 ..

.B

lo

ck

in

sw

itc

h

S

B

-A

S

T-

S

V

...

 S

ys

te

m

ba

us

te

in

 1

10

/1

60

 

S

B

-A

S

T-

S

V

...

 S

ys

te

m

 u

ni

t 1

10

/1

60

B

R

  .

.. 

E

xt

er

ne

 W

är

m

ea

nf

or

de

ru

ng

B

R

  .

.. 

ex

te

rn

al

 h

ea

t r

eq

ui

re

m

en

t

A

S

H

B

 ..

A

sc

he

bo

xs

ch

al

te

r

A

S

H

B

 ..

A

sh

bo

sw

itc

h

A

U

E

..

A

ut

om

at

is

ch

U

m

sc

ha

lte

in

he

it 

(V

or

ra

ts

ra

um

)

*

B

1/

 

V

or

la

uf

te

m

pe

ra

tu

rw

äc

ht

er

 (b

ei

 B

ed

ar

f)

A

U

E

..

A

ut

om

at

ic

 c

ha

ng

e-

ov

er

 d

ev

ic

(s

to

ra

ge

 

ro

om

)

*

B

1/

  

Fl

ow

 te

m

pe

ra

tu

re

 s

w

itc

- o

de

m

an

(s

er

ia

l c

on

ne

ct

io

w

ith

 p

um

p)

K

...

W

as

se

re

rw

är

m

er

an

fo

rd

er

un

(P

ot

en

tia

lfr

ei

er

 E

in

ga

ng

 m

it 

G

ol

dk

on

ta

kt

)

B

U

S

-T

2B

 ..

. C

on

tro

l b

us

 c

on

ne

ct

io

(T

op

Tr

on

ic

-T

)

K

...

C

al

or

ifi

er

 - 

de

m

an

(P

ot

en

tia

l f

re

in

pu

t w

ith

 g

ol

co

nt

ac

t)

4.3.5  Legend, wiring diagram, connection diagram

34

4 211 326 / 01

InSTALLATIOn

Содержание 30-BioLyt 13

Страница 1: ...ialists These instructions are intended for the specialist Electrical installation must be performed by a licensed electrician BioLyt 8 36 Wood pellet boiler These instructions apply to the following...

Страница 2: ...e burner 10 2 3 5 Fitting the control routing probes and sensors 12 2 3 6 Fitting the casing and the pellet hopper 14 2 3 7 Fitting the RAS 81 suction system Option 16 3 Technical information 3 1 Brie...

Страница 3: ...ffer storage tank 36 5 3 Commissioning 36 5 4 Installation inspection 36 6 Maintenance 6 1 Cleaning the boiler 37 6 2 Annual maintenance by the heating engineer 37 6 2 1 Heating system 37 6 2 2 Boiler...

Страница 4: ...mentation for the components Further sources of information Hoval catalogue standards regulations 1 4 Approvals and identification Wood pellet boilers of the type series BioLyt are designed and approv...

Страница 5: ...n SWKI 93 1 safety guidelines for the installation of heating systems Observe the SIA recommendations No 384 4 Flue systems for heating systems in buildings calculation of cross sections Procal FKR gu...

Страница 6: ...ssembled ash box 6 Control Combustion regulation completely pre assembled on retaining plate wiring harness and safety temperature limiter Heat distribution controller TopTronic T pre installed in the...

Страница 7: ...owards the outside 4 Figure 03 2 2 1 2 Fitting refractory lining elements The elements are fitted by following the instructions above in reverse order Pay attention to the side nipple on the post comb...

Страница 8: ...tical screw 4a Torx T25 on the underside of the ash screw tube Remove the bearing 4b Pull the ash screw out 4 of the bottom section 4a 4b 4 Figure 04 2 3 2 Changing the boiler door attachment side Opt...

Страница 9: ...thread protection caps 3 Figure 08 from the connections between the bottom section and the heat exchanger 3 Figure 08 4 Fit each of the three corrugated pipe elbows see enclosed assembly instructions...

Страница 10: ...10 3 Loosen the two screws 3 Figure 09 of the secondary air connection 3a and pull the secondary air connection off this makes it easier to insert the burner into the bottom section 7 Fold the insulat...

Страница 11: ...olts anti clockwise turning them just a short distance in anti clockwise direction will release them from their anchoring in the bottom section 8 Check that the burner is tightly seated on the bottom...

Страница 12: ...U Lambda probe O2 Boiler sensor BK Flue gas sensor BAG Rotating grate DR Heating surface motor HFR Induced draught fan SZG 4 After all the cables have been routed proceed to fit and secure the plug in...

Страница 13: ...Detail C 5a 5 5b 7a 5a Figure 14 Detail D 2f 2a 2c Detail A 1 8 8a 1a 2b 7 1b 2 7b 7c 2d 2e Detail B 11b 13 4 211 326 01 Installation...

Страница 14: ...d bottom with the jubilee clip 5 i When fitting an RAS 81 suction system Option proceed from Chapter 2 3 7 6 Mount the burner cover Working from below hook the burner cover 6 Figure 15 into the pins p...

Страница 15: ...1 6 4a 2 4c 3a 3b 10 7 8 5a 5 10 10a 9 Figure 15 Detail E Detail G 11a 11 4 8a 6a 4f 4e Detail F 4g 4d 4b 15 4 211 326 01 Installation...

Страница 16: ...M6 threaded bolts 5a Place a plastic insulating sleeve 5b with the collar facing downwards and a large washer 5c on each bolt and then fix the suction system in position with self locking nuts 5d 6 Ro...

Страница 17: ...2 1b 1c 1d 1d 8b 8a 1b 8 1a 2 4 2b 5 2a Figure 16 Figure 17 4a Detail H View from below 5b 5c 5d 5a 3 7 17 4 211 326 01 Installation...

Страница 18: ...EN 14961 2 A1 ENplus The core element of the BioLyt is a rugged horizontal burner tube which provides a stable fire bed with its large plate shaped burner The post combustion ring and dust separator a...

Страница 19: ...12 34 56 40 63 66 Hydraulic resistance at 20 K mbar 2 4 10 15 11 17 18 Water flow rate at 10 K m h 0 69 1 12 1 29 1 97 2 15 2 66 3 09 Water flow rate at 20 K m h 0 34 0 56 0 65 0 99 1 08 1 33 1 55 Boi...

Страница 20: ...36 DN 40 1 2 Boiler return BioLyt 8 23 DN 32 1 BioLyt 25 36 DN 40 1 3 Drain DN 20 4 Boiler controller 5 Boiler temperature sensor 6 Boiler return sensor and STB 7 Lambda probe 8 Flue gas sensor 9 Flu...

Страница 21: ...it will then no longer be possible to fully open the front door The front door then has to be removed in order to perform maintenance work see Chapter 2 3 6 Detail G Minimum clearance above the boiler...

Страница 22: ...Lyt 25 36 985 570 148 kg Heat exchanger BioLyt Type Weight BioLyt 8 36 144 kg Can be reduced by 17 4 kg by removing the refractory lining elements see Chapter 2 2 1 1 3 5 Overall unit dimensions and w...

Страница 23: ...storage room The pipelines must not be in the way here Buffer storage tank The use of a small load balancing storage tank 200 litres ensures optimum operation of a pellet heating system and is recomm...

Страница 24: ...to the safety equipment pressure expansion tank safety valve etc must be secured against unintentional closing Install sacks to prevent single pipe gravity circulation Legend MC1 Pump mixer circuit 1...

Страница 25: ...ow sensor 1 VF 2 Flow sensor 2 SF Calorifier sensor PF 1 Buffer sensor 1 PF 2 Buffer sensor 2 RS T Room station CW Cold water DHW Domestic hot water Important notes The hydraulic schematic merely show...

Страница 26: ...y seal the flue gas pipe against the flue gas system The insertion of the flue gas pipe into the flue gas system must be carried out in such a way that no condensation water can flow from the flue gas...

Страница 27: ...on 1 Dismantle the front cover Remove securing screw 8a Figure 15 Slide upper front cover 1 Figure 18 upwards and remove 2 Remove cover 2 3 Remove protection plate 3 by releasing the two screws on the...

Страница 28: ...in 1mm2 Quando i conduttori superano la lunghezza di 50m fare riferimento alle disposizioni relative al cablaggio Must not by connected to mains supply Must be separate to mains cables Minimum Cables...

Страница 29: ...peuvent en aucun cas tre raccord es au r seau Elles doivent tre tir es dans un c bles s par Section min 1mm Il faut respecter les directives de c blage Conducono bassa tensione e non devono essere col...

Страница 30: ...em separaten Kabel zu verlegen Bei Bus Leitungen sind die Verdrahtungsrichtlinien zu beachten Elles sont aliment es en courant faible et ne peuvent en aucun cas tre raccord es au r seau Elles doivent...

Страница 31: ...tre raccord es au r seau Elles doivent tre tir es dans un c bles s par Section min 1mm Il faut respecter les directives de c blage Conducono bassa tensione e non devono essere collegati alla rete Que...

Страница 32: ...tt min 1mm Diese Leitungen sind in einem separaten Kabel zu verlegen Bei Bus Leitungen sind die Verdrahtungsrichtlinien zu beachten Elles sont aliment es en courant faible et ne peuvent en aucun cas t...

Страница 33: ...en Querschnitt min 1mm Diese Leitungen sind in einem separaten Kabel zu verlegen Bei Bus Leitungen sind die Verdrahtungsrichtlinien zu beachten Elles sont aliment es en courant faible et ne peuvent en...

Страница 34: ...e HS Modulating stoker DG Pressure fan SZG Induced draught fan Z Ignition UE LL Switching unit counterclockwise rotation storage room PBSo Fill level pellets box top PBSu Fill level pellets box bottom...

Страница 35: ...should lie between 8 3 and 9 5 after 6 12 weeks of heating operation filling and replacement water For a plant using Hoval boilers untreated drinking water is generally best suited as heating medium i...

Страница 36: ...to the user in detail Information for the installer Obtain from the user written confirmation that the operation and maintenance procedures have been explained to him and that he has received the corr...

Страница 37: ...re are no glowing embers Otherwise your vacuum cleaner could be destroyed Use a vacuum cleaner to remove residue from the burner plate Carefully vacuum clean the air holes Check the immersion sleeve o...

Страница 38: ...e target temperature HC 20 C 5 30 C Daytime target temperature MC1 20 C 5 30 C Daytime target temperature MC2 20 C 5 30 C Night time target temperature HC 16 C 5 30 C Night time target temperature MC1...

Страница 39: ...2 Cycle 3 Cycle 1 Cycle 2 Cycle 3 from to from to from to from to from to from to from to from to from to Mo Tu We Th Fr Sa Su Mixer Circuit 1 Time program P1 Time program P2 Time program P3 Tag Cycl...

Страница 40: ...1 HF 4 Limit temperature for summer disconnection 22 C HF 5 System frost protection 3 C HF 6 Demand contact module for VE1 1 HF 7 Demand contact module for VE2 1 HF 8 Demand contact module for VE3 1...

Страница 41: ...me out OFF 30 min HF 20 PI reference value control OFF HF 21 PI amplification factor P portion Xp 0 1 k OEM 22 PI scanning time Ta 20 s OEM 23 PI reset time Tn 600 s C OEM UNMIXED CIRC Par Designation...

Страница 42: ...tion abatement heating circuit 0 8 k HF 15 Pump follow on 5 min HF 16 Screed function OFF HF 18 P portion Xp 2 0 k OEM 19 Scanning time Ta 20 s OEM 20 I portion Tn 270 s OEM 21 Running time servomotor...

Страница 43: ...tion abatement heating circuit 0 8 k HF 15 Pump follow on 5 min HF 16 Screed function OFF HF 18 P portion Xp 2 0 k OEM 19 Scanning time Ta 20 s OEM 20 I portion Tn 270 s OEM 21 Running time servomotor...

Страница 44: ...Xp 5 k OEM 20 Modulation scanning time Ta 20 s OEM 21 Modulation adjustment time Tn 180 s C OEM 22 Modulation running time 12 s HF 23 Modulation starting time 200 s HF 24 Modulation start up output 7...

Страница 45: ...R 06 12 30 BE Time 24 00 Filling off period 1 Stop FILLING PARAMETER 07 15 30 BE Time 24 00 Filling off period 2 Start FILLING PARAMETER 08 22 00 BE Time 24 00 Filling off period 2 Stop FILLING PARAME...

Страница 46: ...boiler temperature BOILER PARAMETER 05 53 HF C 70 Return mixer run time BOILER PARAMETER 06 150 HF s 600 Return pump follow on time BOILER PARAMETER 09 10 HF min 540 Buffer sensor BP operating mode B...

Страница 47: ...on 2 HF 7 Heat generator cycle lock only when parameter 06 1 3 4 0 5 h HF 8 Solar priority parallel changeover 10 k HF 9 Solar heat balance OFF HF SOLAR RESET Reset heat balance HF 11 Volumetric flow...

Страница 48: ...Par Designation Factory 10 20 30 40 50 Lev 1 Bus address central device 10 HF 2 Bus right RS direct circuit 1 HF 3 Bus right RS mixer circuit 1 1 HF 4 Bus right RS mixer circuit 2 1 HF BUFFER Par Des...

Страница 49: ...MAINTENANCE ST 1 for X days 7 HF 12 Maintenance according to fixed date OFF HF 13 Maintenance according to fixed interval OFF HF 14 Maintenance according to maintenance counter OFF HF 15 Reset mainte...

Страница 50: ...on KVLF 19 0 System Collector sensor Short circuit KVLF 19 1 System Room sensor RS Interruption 20 0 System Room sensor RS Short circuit 20 1 System Burner 1 No switching off 1 min 30 2 With par log a...

Страница 51: ...tpoint 85 4 System HP return sensor Return max temp exceeded 85 5 System QF Heat source min temp below setpoint 86 4 System QF Heat source max temp exceeded cooling operation 86 5 System QF Fault heat...

Страница 52: ...ive E 45 Feeder does not draw in pellets only with use of suction probe switching unit E 46 Max run time for suction probe switchover move to zero point exceeded only with use of the suction probe swi...

Страница 53: ...53 4 211 326 01...

Страница 54: ...ype Serial number Year of manufacture Place Date System installer System user Confirmation The user owner of the system herewith con rms that he has received adequate instruction in the operating and...

Отзывы: