33
HOSHIZAKI EUROPE
B.V.
4)
Probes and inlet/outlet pipes which
connected with Evaporator must cover
by PVC insulation tape and make sure all
these elements adjust properly.
5) Make sure the sensor position is right
and suitable and drain path must be
checked.
6) There must be sheet plate under
the Defrost Heater to prevent plastic
surface from melting.
7) Make sure the sensor is correctly
positioned and drain path is checked.
8) After fitting the evaporator box secure
the belts and do not overtighten. Make
sure there are no gaps around the base
of the box.
9) Make sure the pipe and cable
entry point is fully sealed with putty.
10)
Vacuum Breaker must be sealed by putty on Freezer Cabinets, it must be also
checked by service technicians!
11) When the positioning is done the
dryer mustn’t touch with any
surface.
Содержание PREMIER 60
Страница 39: ...39 HOSHIZAKI EUROPE B V PREMIER K 70 PREMIER M 70 PREMIER F 70 17 Dimensions...
Страница 40: ...40 HOSHIZAKI EUROPE B V PREMIER KG 70...
Страница 41: ...41 HOSHIZAKI EUROPE B V PREMIER K W80 PREMIER M W80 PREMIER F W80...
Страница 42: ...42 HOSHIZAKI EUROPE B V PREMIER KG W80...
Страница 43: ...43 HOSHIZAKI EUROPE B V PREMIER K 60 PREMIER M 60 PREMIER F 60...
Страница 44: ...44 HOSHIZAKI EUROPE B V PREMIER KG 60...
Страница 45: ...45 HOSHIZAKI EUROPE B V ELECTRICAL WIRING DIAGRAM FOR CABINET REFRIGERATOR MODELS 18 Wiring Diagram...
Страница 46: ...46 HOSHIZAKI EUROPE B V ELECTRICAL WIRING DIAGRAM FOR CABINET FREEZER MODELS...
Страница 47: ...47 HOSHIZAKI EUROPE B V 19 Cooling Diagram...