21
Sanitizing Rinse 3
25) Turn the cleaning valve to the right until completely horizontal (closed). Move the control
switch to the "ICE" position, then replace the front panel. After 3.5 min., remove the front
panel, then move the control switch to the "OFF" position.
26) Turn the cleaning valve to the left until completely vertical (open). Move the control
switch to the "WASH" position, then replace the front panel. After 5 min., remove the
front panel, then move the control switch to the "OFF" position.
27) Remove the front insulation panel, then slide the cube guide to the right. Remove the
rubber hose and overflow cap covering the overflow pipe. Unscrew the overflow pipe.
After the water tank has drained, reconnect the overflow pipe. Replace the rubber hose,
overflow cap, cube guide, and front insulation panel.
NOTICE
! Be sure the O-ring is
attached to the bottom of the overflow pipe and be careful not to cross thread the
overflow pipe.
28) Clean the ice storage bin liner using a neutral cleaner. Rinse thoroughly after cleaning.
29) Turn the cleaning valve to the right until completely horizontal (closed). Move the control
switch to the "ICE" position. Note: If on a dispenser unit, turn on the dispenser unit
power supply.
30) Replace all panels in their correct positions.