56
6. HOT GAS VALVE
IMPORTANT
Always install a new drier every time the sealed refrigeration system is
opened. Do not replace the drier until after all other repair or replacement
has been made.
1) Unplug the icemaker or disconnect the power source.
2) Remove the top, front and right side panels.
3) Recover the refrigerant and store it in a proper container, if required by an applicable
law (See “1. [b] REFRIGERANT RECOVERY”).
4) Disconnect the hot gas valve leads.
5) Remove the screw and the solenoid coil.
6) Remove the valve and drier using brazing equipment.
7) Braze the new hot gas valve with nitrogen gas flowing at the pressure of 0.2 - 0.3
bar.
WARNING
Always protect the valve body by using a damp cloth to prevent the valve
from overheating. Do not braze with the valve body exceeding 120°C.
8) Install the new drier (See “3. DRIER”).
9) Check for leaks using nitrogen gas (10 bar) and soap bubbles.
10) Evacuate the system and charge it with refrigerant (See “1. [c] EVACUATION AND
RECHARGE”).
11) Attach the solenoid coil to the valve body, and secure it with the screw.
12) Connect the leads.
13) Replace the panels in their correct positions.
14) Plug in the icemaker or connect the power source.
Содержание IM-240ANE
Страница 4: ...1 I SPECIFICATIONS 1 DIMENSIONS SPECIFICATIONS a IM 240DNE Air cooled ...
Страница 5: ...2 b IM 240DNE C Air cooled ...
Страница 6: ...3 c IM 240DWNE Water cooled ...
Страница 7: ...4 d IM 240DWNE C Water cooled ...
Страница 8: ...5 e IM 240DWNE R452 Water cooled ...
Страница 9: ...6 f IM 240ANE Air cooled ...
Страница 10: ...7 g IM 240AWNE Water cooled ...
Страница 11: ...8 h IM 240DSNE Remote Air cooled ...
Страница 12: ...9 j URC 240C E 4 Condenser Unit ...
Страница 20: ...17 a CONTROLLER BOARD LAYOUT Main Board Sub Board Combination ...
Страница 37: ...34 2 WIRING DIAGRAM a IM 240DNE C XNE C IM 240DWNE C R452 XWNE C R452 IM 240ANE AWNE ...
Страница 38: ...35 b IM 240DSNE XSNE URC 240C E 4 ...
Страница 69: ...66 Fig 16 Controller Board Board Support Control Box Cover Screw ...