background image

LMAN0073-01-EN

Hazardous Location Series

02/2021

 

 

Pag

e 5 

 

Wall 90º

 

Step 1. Mark and drill desired loca�on on moun�ng  

 

 

              surface, secure the junc�on box (provided) with 4  

 

              (M8) expansion bolts (not provided) directly to a   

 

              structural member

thread onto a NPT 3/4 inch    

 

              conduit.

 

Step 2. Pull field wiring into the wall mount adapter.  

 

 

              Secure the adapter with 6 (M4) screws (provided)  

 

              directly to the junc�on box. Make sure the gasket  

 

              of the adapter is properly inserted into the slot.

 

Step 3. Hang the hood onto the adapter, align as marked.

 

Step 4. Rotate the hood clockwise and secure the adapter  

 

              with M5 screws (provided) to (5 N-m).

 

Step 5. Hang the fixture onto the hinge hook of the hood   

 

              and Connect supply wires to luminaire wire leads   

 

              (or Wago connectors).

 

Step 6. Close driver housing, making sure that all wires are  

 

              safely inside driver. Tighten three cap�ve closing   

 

              screw (M6) to (6 N-m).

               

Note: All installation must refer to "NPT Assembly 

                             Instructions" to prevent water leakage.

Step 1

Step 2

Step 3

Step 4

Step 5

3/4’’ NPT

Expansion bolts

(Washers required) M8

Step 6

Socket head cap screws M4

Top view

Mark

Mark

Top view

Socket head cap screws M5

Step 6

Содержание ETG-HHR

Страница 1: ...her wiring methods in accordance with Ar cle 502 in the Na onal Electrical Code NFPA 70 Turn off electrical power at fuse or circuit breaker box before wiring fixture to the power supply Turn off the power when you perform any maintenance Verify that supply voltage is correct by comparing it with the luminaire label informa on Make all electrical and grounded connec ons in accordance with the Na onal...

Страница 2: ...o suitable conduit 3 Inset the wire from outside through the conduit and the entry hole of Tank then connect to Terminal Block 4 Introduce the wires of branch circuit as following Black wiring connects to Line White wiring connects to Neutral Green wiring connects to Ground 5 Re a ach the Tank Cover and ghten it by eight M6 hexagon bolts of Tank Cover with torque value 6 N m 6 Check the ghtness of...

Страница 3: ...ket Step 1 Secure the bracket and hood with 4 M10 expansion bolts not provided directly to a structural member make sure the hinge is located as marked See Figure 1a Adjust the angle 6x15 of the bracket and fix the posi on with M5 screws provided Step 2 Hang the fixture onto the hinge hook of the hood Connect supply wires to luminaire wire leads or Wago connectors Step 3 Close driver housing making ...

Страница 4: ...he M5 set screw Make sure the gasket of the adapter is properly inserted into the slot Step 2 Hang the hood onto the adapter align as marked Step 3 Rotate the hood clockwise and secure the adapter with M5 screws provided to 5 N m Step 4 Hang the fixture onto the hinge hook of the hood Connect supply wires to luminaire wire leads or Wago connectors Step 5 Close driver housing making sure that all wi...

Страница 5: ...ot Step 3 Hang the hood onto the adapter align as marked Step 4 Rotate the hood clockwise and secure the adapter with M5 screws provided to 5 N m Step 5 Hang the fixture onto the hinge hook of the hood and Connect supply wires to luminaire wire leads or Wago connectors Step 6 Close driver housing making sure that all wires are safely inside driver Tighten three cap ve closing screw M6 to 6 N m Note...

Страница 6: ...all parts are properly assembled Electrically check to make sure that all connec ons are clean and ght NPT Assembly Instruc ons Step 1 Inspect port and fi ng to ensure that both are free of contaminants and excessive burrs and nicks Step 2 Apply a stripe of an anaerobic liquid pipe sealant around the male threads leaving the first two threads uncovered If no liquid sealant is available wrap Teflon ta...

Отзывы: