382
SmartStacker User's Manual
SmartStacker
7-1-5
Checking the Sheet Guide
The sheet guides are attached on the 1st Process Unit and the 2nd Process Unit. They are the
transparent rubber parts and they hold top and bottom of sheet while the sheet is being transported.
These sheet guides may bend if they are kept being pressed by the cutter holder.
Check the sheet guides once a week.
1st Process Unit
Sheet Guides
2nd Process Unit
Sheet Guides
Содержание SmartStacker
Страница 106: ...This page is intentionally left blank ...
Страница 110: ...110 SmartStacker User s Manual Daily Safety Check Lift the cover pressing the hooks Hooks ...
Страница 146: ...This page is intentionally left blank ...
Страница 170: ...This page is intentionally left blank ...
Страница 206: ...This page is intentionally left blank ...
Страница 207: ...6 This chapter explains some possible problems and suggests some solutions 6 Troubleshooting ...
Страница 367: ...367 SmartStacker User s Manual If a Jam Occurs B2 Stacker Option 10606650901C1 Feeder Option ...
Страница 368: ...This page is intentionally left blank ...
Страница 376: ...376 SmartStacker User s Manual SmartStacker Merge Conveyor Merge Stacker B2 Stacker Optional ...
Страница 379: ...379 SmartStacker User s Manual SmartStacker B2 Stacker Optional Vacuum Belt ...
Страница 381: ...381 SmartStacker User s Manual SmartStacker Merge Conveyor ...
Страница 390: ...This page is intentionally left blank ...
Страница 391: ...6 8 This chapter lists the specifications for this machine 8 Appendix ...
Страница 411: ...This page is intentionally left blank ...
Страница 412: ...Manufacturer Phone 81 75 934 6700 Fax 81 75 934 6708 www horizon co jp ...