
48
W
ARRANTY
SAFETY
INSTRUCTIONS
RECOMMENDED
TOOLS
MAINTENANCE
PROPER
HEART
RA
TE
USAGE
5-STEP
DIAGNOSIS
PROCESS
VOL
TAGE
CHECKS
AND
LED
DIAGNOSIS
WIRING
DIAGRAMS
AND
SCHEMA
TICS
ENGINEERING
MODE
TROUBLESHOOTING
SPARE
PARTS
REPLACEMENT
Tools Required:
• Philips Screwdriver
• 4mm, 5mm, 6mm, 8mm Allen Wrenches
• 13mm Socket and Combination Wrench
Procedure:
1) Remove the motor cover, rear roller end caps, and guide rails. (Figures 35 & 36)
)
For Models T61 -T64/CST 3.5 & 4.5/DT650 & 850/WT950 Only
- Peel off grip tape stickers on front
guide rail to expose the two screws underneath. Remove screws and remove front guide rail.
Running Belt/Deck Replacement
'SPOU(VJEF3BJM
.PUPS$PWFS
(SJQ5BQF
4DSFXT
3FBS(VJEF3BJM
.PUPS$PWFS
(VJEF3BJM
&OE$BQT
'SPOU3PMMFS
%FDL#PMU
3FBS3PMMFS
.PUPS1VMMFZ
%SJWF#FMU
'SPOU3PMMFS1VMMFZ
4FOTPS#SBDLFU
5FOTJPOCPMU
#PMU"
#PMU#
3) Remove tension bolts and remove the rear roller. (Figure 37)
Figure 35
Figure 36
Figure 37
SPARE
PARTS
REPLACEMENT
Содержание CST 3.5
Страница 65: ...65 Notes...