Main Unit Setup
9
Main Unit Setup
Putting the valve stickers
If you use the manual measurement/calibration mode, it may be useful to put the valve
stickers on the operation button panel as shown below.
Fig. 10 Positions of the valve stickers
Placing the absorbent sheet
Follow the steps below to place the absorbent sheet on the tray in the main unit.
1.
Turn OFF the power.
2.
Open the right cover.
3.
Place the absorbent sheet on the tray using tweezers.
Fig. 11 Tray in the main unit
4.
Close the right cover.
Содержание OCMA-500
Страница 1: ...Oil Content Analyzer OCMA 500 Instruction Manual CODE GZ0000331784D ...
Страница 20: ......
Страница 58: ...Measurement 38 Flow scheme of operation Fig 36 Operation flow of automatic measurement ...
Страница 65: ...Measurement 45 Manual measurement Flow scheme of operation Fig 45 Operation flow of manual measurement ...
Страница 140: ......