Using this manual
Manual_Grid_Power_FNC_en_V3_0
4
Storage of Filled and Charged (FC) Cells
Storage of Unfilled and Uncharged (UU) and Filled and Uncharged (FU) grid|power
Before Mounting a Rack or Cabinet
Checking the Scope of Delivery
Preliminary Work on Unfilled and Uncharged grid|power FNC
Charging Procedures for the Initial Commissioning
Charging with Constant Current
Charging with Constant Current and Constant Voltage (CCCV)
Commissioning of Unfilled and Uncharged (UU) and Filled and uncharged (FU)
Commissioning Filled and Charged (FC) FNC
Capacity Testing of Batteries According to DIN IEC 60623
Checking for Cleanliness and Condition of the Battery System
Checking the Electrolyte Levels
Measuring the Charging Voltage
Testing the Insulation Resistance
Fill up the Electrolyte Level with Distilled Water
Over Consumption of Distilled Water
Dispersion of the Individual Cell Voltages
Available Battery Capacity is Low