background image

  

I56-3433-004 

 

 04-12

FIGURE 6. WIRING CONNECTIONS AT DETECTOR

SLC (–

)

SLC (+)

SLC (–

)

SLC (+)

RESET

 I NPUT

TEST

 INPU

T

AUX (–)

REMOTE 

ALARM OUT

NOT

 USED

REMOTE 

TROUBLE OUT

TEST

 OPTION (–)

TEST

 OPTION (+)

T3

T2

T1

C0260-01

FIGURE 7. WIRING DIAGRAM

+ ñ

+

ñ

+

+

TO NEXT

DEVICE

FROM PANEL OR

PREVIOUS DEVICE

LISTED

REMOTE

POWER

SOURCE

* Only used for

  SK-BEAM-T. See

  electrical ratings.

COMMUNICATION LINE

32 VDC MAX.

TWISTED PAIR IS

RECOMMENDED.

ñ

ñ

ñ

+

T3

T2

T1

C0335-03

FIGURE 8. WIRING DIAGRAM (RTS451/RTS151)

RTS451/RTS451KEY 

or RTS151/RTS151KEY

DETECTOR

PIN 1

REMOTE ALARM OUT

T2-1
T2-2
T2-4

T2-3

AUX (–)

SLC IN +

T1-1
T1-2

T1-3
T1-4

SLC IN –

SLC OUT +
SLC OUT –

RESET INPUT

TEST INPUT

T3-3 REMOTE TROUBLE OUTPUT

OPTIONAL YELLOW LED

PIN 2

PIN 4

PIN 3

PIN 5

C0328-06

FIGURE 9. WIRING DIAGRAM (RTS451/RTS151)

BDT-SS

Alarm

Signal

Circuit

(Note 1)

T2-1

T2-2

Note 1:  See electrical ratings section of this

 

manual for cir cuit output ratings.

SLC (+)

SLC ( –)

Red

C0369-00

INSTALLATION / ALIGNMENT

Reference Figures 10 through 14 for installation, alignment, and maintenance.

Please make sure to complete all steps in order to ensure a successful installa-
tion. Proper application, mounting, alignment, and set-up will minimize false 
alarms and nuisance trouble signals.

PRE-ALIGNMENT CHECKLIST

•   Insure that both the detector and reflector are mounted securely to stable 

surfaces.

•   Insure that all wiring is correct.

•   Insure that terminal blocks are fully seated into their receptacles on the 

detector.

•    Complete any wiring dressing to minimize movement to the detector once 

the alignment procedure is completed.

•    Insure that the appropriate number of reflectors are used for the installed 

distance. Distances between 230 and 328 Feet (70 – 100 m) require ad-
ditional reflectors (4 total). The BEAMLRK accessory should be used in 
these cases.

•   Insure that the line of sight between the detector and reflector is clear 

and that reflective objects are not too near. See Mounting Instructions 
for more details.

•   Insure that both the detector and reflector are mounted within their 

operational parameters for off axis angles. See Mounting Instructions 
for more details.

•   Disable the zone or system to prevent unwanted alarms before applying 

power.

•   Insure power to the detector is “ON”.

•   Insure that the appropriate address is set on the code wheels.

You are now ready to begin the alignment procedure.

Содержание SK-Beam

Страница 1: ...ication every 5 sec LED flashing SLC 24 V Max Alarm LED on 8 5 mA Max Max Trouble LED on 4 5 mA Max Max Alignment 20 mA Max External Supply SK Beam T only VOLTAGE 15 to 32 VDC CURRENT 0 5 A Max Remote Output alarm VOLTAGE 15 to 32 VDC NOTE Output voltage same as device input voltage CURRENT 15 mA maximum 6 mA minimum NOTE Output current is limited by 2 2 kΩ resistor GENERAL DESCRIPTION Model SK Be...

Страница 2: ... with the long range reflector kit BEAMLRK BEAMSMK The BEAMSMK allows reflected beam detectors to be mounted when surface wiring is used This kit must be used when mounting the transmitter receiver unit with the multi mount kit BEAMMMK 6500 MMK The 6500 MMK provides a heavy duty multi mount bracket for installations prone to building movement or vibration It offers similar tilt and swivel flex ibi...

Страница 3: ... A sur face that moves shifts vibrates or warps over time will cause false alarm or trouble conditions Initial selection of a proper mounting surface will elimi nate false alarms and nuisance trouble signals Mount the detector on a stable mounting surface such as brick concrete a sturdy load bearing wall support column structural beam or other sur face that is not expected to experience vibration ...

Страница 4: ...lector In cases where operation through panes of glass cannot be avoided some spe cific installation practices can help to minimize the effects of the glass These practices include avoid penetration of multiple panes of glass position the glass so that it is not perpendicular to the line of sight between the detector and the reflector A minimum of 10 off perpendicular should be considered and make...

Страница 5: ... to ensure a successful installa tion Proper application mounting alignment and set up will minimize false alarms and nuisance trouble signals PRE ALIGNMENT CHECKLIST Insure that both the detector and reflector are mounted securely to stable surfaces Insure that all wiring is correct Insure that terminal blocks are fully seated into their receptacles on the detector Complete any wiring dressing to...

Страница 6: ...ment process The display will continue to read Lo until the detector receives enough light from the reflector to function properly 3 With the display indicating a numeric value begin adjusting the horizon tal adjustment wheel in the direction that increases the number on the display When the number starts decreasing continue rotating the knob 3 4 revolutions past the peak value to confirm that you...

Страница 7: ... the outer housing 4 Press the reset button making sure to avoid blocking the line of sight between the detector and reflector The yellow LED will begin to blink for about 20 seconds At this time the detector is making its final gain adjustment to compensate for the effects of installing the outer housing When the gain adjustment is complete the yellow LED will turn off and the green LED will begi...

Страница 8: ... perform a complete reflector blockage test as in step 4 of the Instal lation Alignment procedure to insure that the pathway between the detector and reflector is clear NOTE For the SK Beam this test does not satisfy the requirements of NFPA72 for periodic maintenance and sensitivity verification of beam type detectors For the SK Beam T this test in conjunction with the complete reflector block ag...

Страница 9: ...onse Off 4 Quick Blinks Blink Blink Off Beam Blockage Remove blockage Faulty unit Initialization Power on Off Blink until complete Blink Blink Off Apply Power from discharged state Initialization alignment exit Off Blink until complete Blink Blink Off Depressing RESET switch after alignment Local Test SK Beam T Pass Result On Blinking the amount of drift used Off On Off Panel or RTS451 RTS451KEY R...

Страница 10: ...10 I56 3433 004 04 12 ...

Страница 11: ...11 I56 3433 004 04 12 APPENDIX II DETECTOR DRILLING TEMPLATE 4 345 6 190 157 mm 110 mm Scale 1 1 C0278 00 ...

Страница 12: ...12 I56 3433 004 04 12 ...

Страница 13: ...13 I56 3433 004 04 12 APPENDIX III REFLECTOR DRILLING TEMPLATE 5 512 140mm 8 465 215mm Scale 1 1 C0279 00 ...

Страница 14: ...erence when the equip ment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to corr...

Отзывы: