background image

  14 

I56-3433-004 

  

©2017 Honeywell. 04-12

Please refer to insert for the Limitations of Fire Alarm Systems

This projected beam smoke detector has been tested and found to comply with the 
limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are 
designed to provide reasonable protection against harmful interference when the equip-
ment is operated in a commercial environment. This equipment generates, uses, and 

can radiate radio frequency energy and, if not installed and used in accordance with the 
instruction manual, may cause harmful interference to radio communications. Operation 
of this equipment in a residential area is likely to cause harmful interference in which 
case the user will be required to correct the interference at his own expense.

FCC STATEMENT

Silent Knight

®

 and Honeywell

®

 are registered trademarks of Honeywell International, Inc.

Содержание SK-Beam

Страница 1: ...ication every 5 sec LED flashing SLC 24 V Max Alarm LED on 8 5 mA Max Max Trouble LED on 4 5 mA Max Max Alignment 20 mA Max External Supply SK Beam T only VOLTAGE 15 to 32 VDC CURRENT 0 5 A Max Remote Output alarm VOLTAGE 15 to 32 VDC NOTE Output voltage same as device input voltage CURRENT 15 mA maximum 6 mA minimum NOTE Output current is limited by 2 2 kΩ resistor GENERAL DESCRIPTION Model SK Be...

Страница 2: ... with the long range reflector kit BEAMLRK BEAMSMK The BEAMSMK allows reflected beam detectors to be mounted when surface wiring is used This kit must be used when mounting the transmitter receiver unit with the multi mount kit BEAMMMK 6500 MMK The 6500 MMK provides a heavy duty multi mount bracket for installations prone to building movement or vibration It offers similar tilt and swivel flex ibi...

Страница 3: ... A sur face that moves shifts vibrates or warps over time will cause false alarm or trouble conditions Initial selection of a proper mounting surface will elimi nate false alarms and nuisance trouble signals Mount the detector on a stable mounting surface such as brick concrete a sturdy load bearing wall support column structural beam or other sur face that is not expected to experience vibration ...

Страница 4: ...lector In cases where operation through panes of glass cannot be avoided some spe cific installation practices can help to minimize the effects of the glass These practices include avoid penetration of multiple panes of glass position the glass so that it is not perpendicular to the line of sight between the detector and the reflector A minimum of 10 off perpendicular should be considered and make...

Страница 5: ... to ensure a successful installa tion Proper application mounting alignment and set up will minimize false alarms and nuisance trouble signals PRE ALIGNMENT CHECKLIST Insure that both the detector and reflector are mounted securely to stable surfaces Insure that all wiring is correct Insure that terminal blocks are fully seated into their receptacles on the detector Complete any wiring dressing to...

Страница 6: ...ment process The display will continue to read Lo until the detector receives enough light from the reflector to function properly 3 With the display indicating a numeric value begin adjusting the horizon tal adjustment wheel in the direction that increases the number on the display When the number starts decreasing continue rotating the knob 3 4 revolutions past the peak value to confirm that you...

Страница 7: ... the outer housing 4 Press the reset button making sure to avoid blocking the line of sight between the detector and reflector The yellow LED will begin to blink for about 20 seconds At this time the detector is making its final gain adjustment to compensate for the effects of installing the outer housing When the gain adjustment is complete the yellow LED will turn off and the green LED will begi...

Страница 8: ... perform a complete reflector blockage test as in step 4 of the Instal lation Alignment procedure to insure that the pathway between the detector and reflector is clear NOTE For the SK Beam this test does not satisfy the requirements of NFPA72 for periodic maintenance and sensitivity verification of beam type detectors For the SK Beam T this test in conjunction with the complete reflector block ag...

Страница 9: ...onse Off 4 Quick Blinks Blink Blink Off Beam Blockage Remove blockage Faulty unit Initialization Power on Off Blink until complete Blink Blink Off Apply Power from discharged state Initialization alignment exit Off Blink until complete Blink Blink Off Depressing RESET switch after alignment Local Test SK Beam T Pass Result On Blinking the amount of drift used Off On Off Panel or RTS451 RTS451KEY R...

Страница 10: ...10 I56 3433 004 04 12 ...

Страница 11: ...11 I56 3433 004 04 12 APPENDIX II DETECTOR DRILLING TEMPLATE 4 345 6 190 157 mm 110 mm Scale 1 1 C0278 00 ...

Страница 12: ...12 I56 3433 004 04 12 ...

Страница 13: ...13 I56 3433 004 04 12 APPENDIX III REFLECTOR DRILLING TEMPLATE 5 512 140mm 8 465 215mm Scale 1 1 C0279 00 ...

Страница 14: ...erence when the equip ment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to corr...

Отзывы: