OVERVIEW AND USE
The radiator controller HR 80 is a component of the zoning
system. It can be installed on all the common radiator valves. As
the valve is a self contained unit, there is no risk of it causing
any water leakage from your heating.
The set temperature can be changed...
•
manually using the adjustment dial on the operating unit of
the radiator controller
•
with the command centre
PACK CONTENT
1 Operating unit
2 Coupling module
3 Adapter Danfoss RA
4 Batteries
5 Caleffi adapter
ADDITIONAL DEVICES OR PARTS
The following adapters/coupling modules are available for
Oventrop, Herz, Danfoss, Vaillant and Caleffi valves:
Brand Order
number
Adapter/coupling module
Oventrop
HU 01
(knurled nut M30x1)
073341076
Herz
HU 02
(knurled nut M28)
073341725
Danfoss Adapter Set
EVA 1-Danfoss
072031201
RAV
(gray)
RA (white)
(enclosed)
RAVL
(black)
Vaillant Adapter
EHA 1VAI
072031082
Caleffi –
enclosed
OPERATING ELEMENTS AND DISPLAY
6
5
4
3
1 Display: Shows current
set temperature and
device information.
2 Adjustment dial on the
operating unit: Allows
manual temperature
adjustment.
3 Symbol for the RF connetion to
the command centre.
4 Symbol for separating the operat-
ing unit and coupling module.
5 Set temperature
6 Symbol for actual value coming
from the command centre
(optional).
INSTALLATION
►
Remove the old thermostat.
INSTALLING ADAPTER
►
Select the required adapter.
►
Open up the adapter and push it onto the valve as far as the
stop. Turn it while doing so until you feel it click into place.
If provided on the adapter:
►
Screw the adapter firm or insert the adapter pin.
INSTALLING COUPLING MODULE
The Honeywell-Braukmann, MNG, Heimeier, Junkers,
Landis & Gyr 'Duogyr' valves do not require an adapter. For
adapters for Oventrop, Danfoss, Herz and Vaillant valves, refer to
Section "Additional devices or parts".
1. Turn the adjustment dial of
the coupling module
counterclockwise until the
nose (1) of the adjustment
dial is positioned at the
stop (2) of the housing.
2. Push coupling module onto
the radiator valve.
3. Slide metal knurled nut (3)
onto the threading of the
radiator valve.
4. Tighten the metal knurled
nut without using a tool.
Hint:
The correct installation of the coupling module is best checked
with the central heating switched on. If the coupling module is
correctly installed, the radiator will become warm (adjustment
dial positioned at the left-hand stop).
ACTIVATING BINDING PROCEDURE
Caution!
The radiator controller communicates with the central
operating unit via a wireless connection.
►
When selecting the operating site ensure that the
distance to wireless devices such as wireless
headphones, cordless phones etc. is approx.
1–2 m according to the DECT standard.
New components of the zoning system must be assigned to the
command centre before they can be taken into operation. This
process is called the "binding procedure".
First read through all the steps for the complete binding procedure
and then carry them out. The binding procedure mode remains
active at the radiator controller for a maximum of 4 minutes.
►
Position the operating unit directly near the corresponding
coupling module.
1
►
Press the binding procedure button (1) for approx. one second
and then release it.
When the binding procedure button is released, the symbol
flashes and the software version number is displayed for