1. Switch on the voltage supply (24v)
Note:
The fan starts running 15 seconds after switching on the voltage supply (24 V).
Commissioning
2. Make sure first that the device has been in operation for at least 30 minutes prior to the air flow initialization in order to reach the operating tem-
perature.
3. In order to initialize the connected pipe system, press the Flow-Init-button S2 (see figure) of the corresponding detector module until the green
operating-indicator light of the device starts flashing. The initialization is terminated after approx. 5 seconds. After a successful initialization the op-
erating- indicator light is lit permanently.
4. During and after initialization the pipe system must no longer be changed. Even the ventilator voltage of the device must no longer be modified
after initializations. Otherwise the initialization must be carried out again.