Configuration and electrical connection
22
With controller ZG 252 N, the temperature and ground inputs are
located at the following terminals:
4
5
6
10
TW
ZG 252 N
Ground input
TW-Input
7
8
9
11
12
Depending on the design, the temperature selector and
ground inputs are found on different terminals of the controller
MCR 200.
Boiler feedback
If control cables for heating (“boiler regression”) and for the pump
relay are available:
►
Use cables in accordance with the table on Page 16.
►
Connect boiler regression and pump relay to storey controller as
shown in the following diagram.
Содержание HCE 60
Страница 1: ...Storey Controller HCE 60 Installation and Operation ...
Страница 2: ......
Страница 50: ...Appendix 48 ...
Страница 54: ...Notes 52 Notes ...
Страница 55: ......