Homa San.iQ cut V Скачать руководство пользователя страница 15

EngliSH | 15

1. General

1.1. Declaration of compliance

EC declaration of compliance according to the EC 
Machinery Directive 2006/42 / EC, Annex II Part 1A

Manufacturer name and address:

HOMA Pumpenfabrik GmbH
Industriestrasse 1
53819 Neunkirchen - Seelscheid

We hereby declare that the machine

San.iQ cut V

follows relevant regulations:

Machinery Directive 2006/42/EC
Construction Products Regulations 305/2011/EG

Applied to harmonized standards, the references of which 
have been published in the Official Journal of the EU:

DIN EN 12050-3

Wastewater lifting plants for buil-
dings and land drainage - construc-
tion and testing- 
Part 3: Sewage disposal units for 
limited use

Person responsible for compiling the technical file

Vassilios Petridis
Head of Development and Production
HOMA Pumpenfabrik GmbH

This EC Declaration of Conformity was issued:

Oberheister, 27/01/2020

Vassilios Petridis
Head of Development and Production
HOMA Pumpenfabrik GmbH

1.2. Preface

Dear Customer, 
Thank you for choosing one of our company’s products. 
You have purchased a product which has been manufac-
tured to the latest technical standards. Read this operat-
ing and maintenance manual carefully before you first use 
it. This is the only way to ensure that the product is safely 
and economically used.

The documentation contains all the necessary specifica-
tions for the product, allowing you to use it properly. In 
addition, you will also find information on how to recog-
nize potential dangers, reduce repair costs and downtime, 
and increase the reliability and working life of the product.

All safety requirements and specific manufacturer’s re-
quirements must be fulfilled before the product
is put into operation. This operating and maintenance 
manual supplements any existing national regulations 
on industrial safety and accident prevention. This manual 
must also be accessible to personnel at all times and also 
be made available where the product is used.

1.3. Proper use

The HOMA products comply with the valid safety regu-
lations and meet the demands of state-of-the-art tech-
nology. In the event of improper use, there is a danger 
to life for the user as well as for third parties. Moreover, 
the product and/or attachments may be damaged or de-
stroyed.
It is important to ensure that the product is only operated 
in technically perfect condition and as intended. 
To do so, follow the operating instructions.

1.4. Copyright

This operation and maintenance manual has been copy-
righted by the manufacturer. This operation and mainte-
nance handbook is intended for the use by assembly, op-
erating and maintenance personnel. It contains technical 
specifications and diagrams which may not be reproduced 
or distributed, either completely or in part, or used for any 
other purpose without the expressed consent of the man-
ufacturer.

1.5. Warranty

Costs for removal and installation of the complained prod-
uct at the installation place, costs for the ride of the mech-
anicians to the location and from the installation place as 
well as costs for transport are not components of our war-
ranty. Hereby arose costs, especially costs for checking 
and transport are bearing by the sender or operator of the 
pump. This is also valid for an asserted warranty claim if 
a check results that the unit works faultless and is free of 
defects. All products have a high quality standard. Each 
product is defeated by a strict technical end control before 
delivery. A warranty repair achieved by us does not extend 
the warranty period. Replaced spare parts give no reasons 
for a new warranty period. Extensive claims are excluded, 
especially such as diminution, change or compensation 
also for any kind of follow up damages.

Содержание San.iQ cut V

Страница 1: ...Original Betriebsanleitung EN Original Instruction Manual FR Manuel d instructions original NL Originele handleiding San iQ cut V...

Страница 2: ...05 2 6 Verhalten w hrend des Betriebs 06 2 7 Sicherheits und berwachungseinrichtungen 06 2 8 F rdermedien 06 2 9 Schalldruck 06 3 Allgemeine Beschreibung 07 3 1 Verwendung 07 3 2 Einsatzarten 07 3 3 A...

Страница 3: ...nsdauer des Produktes erh hen Vor Inbetriebnahme sind grunds tzlich alle Sicherheits bestimmungen sowie die Herstellerangaben zu erf llen Diese Betriebsanleitung erg nzt und oder erweitert die bestehe...

Страница 4: ...zun gen von Personen f hren 1 5 3 Wartung Die vorgeschriebenen Wartungs und Inspektionsarbeiten sind regelm ig durchzuf hren und d rfen nur von qualifi zierten und autorisierten Personen durchgef hrt...

Страница 5: ...lstand gekom men sein Der Bediener hat jede auftretende St rung oder Unregelm igkeit sofort seinem Verantwortlichen zu melden Eine sofortige Stillsetzung durch den Bediener ist zwingend erforderlich w...

Страница 6: ...gseinrichtungen ausgestattet Diese Einrich tungen d rfen nicht demontiert oder abgeschaltet wer den Einrichtungen m ssen vor der Inbetriebnahme vom Elektrofachmann angeschlossen und auf eine korrekte...

Страница 7: ...k nicht zerkleinert verbleiben im Sammelbeh lter und k n nen unter Umst nden die Pumpe blockieren Die Flie geschwindigkeit muss in der Druckleitung mindestens 0 7m s betragen 3 2 Einsatzarten Die Abwa...

Страница 8: ...n beachten kann Ihr Produkt ber einen l ngeren Zeitraum eingelagert werden Beachten Sie aber dass die Elastomerteile und die Beschichtungen einer nat rlichen Verspr dung unterliegen 4 4 R cklieferung...

Страница 9: ...ie Kunststoffbox und schieben Sie den WC Stutzen in die Verbindungsmanschette der Anlage Achten Sie unbedingt darauf dass die Hebeanla ge nicht eingedr ckt wird Um ein ger uscharmes Arbeiten zu gew hr...

Страница 10: ...20 M M ller 1 A2 TECH 0000051611 1 2 SaniQ cut V Anschluss Druckleitung Index nderung Datum Name Datum Name HOMA Pumpenfabrik GmbH Industriestra e 1 53819 Neunkirchen Seelscheid Tel 49 0 2247 702 0 E...

Страница 11: ...trieb ge nommen werden nachdem der Schaden fachgerecht behoben wurde 5 3 Elektrik Gefahr durch elektrischen Strom Durch unsachgem en Umgang mit Strom besteht Lebensgefahr Alle Pumpen mit freien Kabele...

Страница 12: ...nik defekt Austausch durch Fachpersonal Schneidwerk verstopft Motorwelle mit einem Schraubendreher links und rechtsherum drehen siehe Bild Motor l uft Pumpe f rdert nicht Druckleitung verstopft geknic...

Страница 13: ...ntaktieren Sie den Kundendienst Dieser kann Ihnen wie folgt weiterhelfen Telefonische und oder schriftliche Hilfestellung durch den Kundendienst Vorort Unterst tzung durch den Kundendienst berpr fung...

Страница 14: ...ure 18 2 7 Safety and control devices 18 2 8 Pumped fluids 18 2 9 Sound Pressure 18 3 General description 19 3 1 Use 19 3 2 Use types 19 3 3 Structure 19 4 Packaging Transport and Storage 20 4 1 Deliv...

Страница 15: ...nts any existing national regulations on industrial safety and accident prevention This manual must also be accessible to personnel at all times and also be made available where the product is used 1...

Страница 16: ...spare parts can seriously damage the product and or injure personnel 1 5 3 Maintenance The prescribed maintenance and inspection work should be carried out regularly This work may only be carried out...

Страница 17: ...tective de vice it must not be switched on again until the error has been corrected Beware of electrical current Incorrectly performed electrical work can result in fatal injury This work may only be...

Страница 18: ...must be checked by an electrician for proper functioning before start up see the Electrical Connection data sheet Please remember that certain equipment requires a decoder device or relay to function...

Страница 19: ...the pump might get blocked The flow rate in the pressure line must be at least 0 7m s 3 2 Use types The sewage lifting systems are designed for intermittent duty S3 30 3 3 Structure The lifting system...

Страница 20: ...lastomer parts and coatings are subject to natural em brittlement 4 4 Materials returned Products that are returned to the factory must be clean and correctly packaged Clean means that the product has...

Страница 21: ...ce the WC in front of the plastic box and push the WC connector into the connecting sleeve of the unit It is es sential to make sure that the disposal unit is not pushed too far in To ensure low noise...

Страница 22: ...2020 M M ller 1 A2 TECH 0000051611 1 2 SaniQ cut V Anschluss Druckleitung Index nderung Datum Name Datum Name HOMA Pumpenfabrik GmbH Industriestra e 1 53819 Neunkirchen Seelscheid Tel 49 0 2247 702 0...

Страница 23: ...be replaced by the manufacturer or an authorised certified service workshop The ma chinery must only be started after appropriate repair of the damage 5 3 Electrics Risk of electrocution Improper use...

Страница 24: ...Cutting system blocked Turn motor shaft with a screwdriver left and right see picture Motor operates pump gives no liquid Discharge blocked breaked Clean remove break Non return valve polluted Clean P...

Страница 25: ...u rectify the fault contact our customer service They can help you as follows Telephone or written help from customer service On site support from customer service Checking and repairing the machine a...

Страница 26: ...l exploitation 30 2 7 Dispositifs de s curit et de surveillance 30 2 8 Agents pomper 30 2 9 Pression acoustique 30 3 Description g n rale 31 3 1 Utilisation 31 3 2 Modes d utilisation 31 3 3 Construct...

Страница 27: ...ue l augmentation de la fiabilit et l allongement de la dur e de vie du produit Avant la mise en service tous les r glements de s curit ainsi que les indications du fabricant doivent tre en prin cipe...

Страница 28: ...Des ajouts ou des transformations ef fectu s unilat ralement ou l utilisation de pi ces non ori ginales peuvent gravement endommager le produit et ou causer de graves blessures corporelles 1 5 3 Maint...

Страница 29: ...u lec trique et s curis contre une remise en marche Toutes les pi ces rotatives doivent tre immobilis es L op rateur doit communiquer imm diatement l appari tion de toute d faillance ou irr gularit so...

Страница 30: ...rit et de surveillance Ces dispositifs ne peuvent pas tre d mont s ou d branch s Les dispositifs doivent tre raccord s avant la mise en service par un lectricien et leur fonctionnement correct doit tr...

Страница 31: ...e La vitesse d coulement dans la conduite sous pres sion doit tre de 0 7 m s minimum 3 2 Modes d utilisation Les stations de relevage d eaux pollu es sont con ues pour un fonctionnement intermittent S...

Страница 32: ...en trepos pendant une plus longue p riode Gardez cepen dant l esprit que les l ments en lastom re et les rev tements sont soumis une fragilisation naturelle 4 4 Retour de livraison Les produits renvoy...

Страница 33: ...Placez le WC devant le r servoir en mati re synth tique et ins rez la tubulure du WC dans la manchette de rac cordement de l installation Veillez absolument ne pas d former la station de relevage par...

Страница 34: ...1 2 SaniQ cut V Anschluss Druckleitung Index nderung Datum Name Datum Name HOMA Pumpenfabrik GmbH Industriestra e 1 53819 Neunkirchen Seelscheid Tel 49 0 2247 702 0 E Mail info homa pumpen de Oberfl c...

Страница 35: ...iche secteur dans une prise de courant mise la terre la station de relevage est pr sent op ration nelle La pompe commence fonctionner d s que le ni veau d eau dans le r servoir collecteur a atteint le...

Страница 36: ...son nel sp cialis Dispositif roue bouch e Avec un tourne vis faire tour ner gauche et droite l arbre moteur voir image Le moteur tourne la pompe ne pompe pas Conduite de pression obstru e flamb e Nett...

Страница 37: ...anne contactez le service apr s vente Il pourra vous aider de la mani re suivante assistance t l phonique et ou crite par le service apr s vente soutien sur place par le service apr s vente examen et...

Страница 38: ...Gedrag tijdens het bedrijf 42 2 7 Veiligheids en bewakingscontroles 42 2 8 Vloeistoffen 42 2 9 Geluidsdruk 42 3 Algemene beschrijving 43 3 1 Toepassing 43 3 2 Toepassingswijzen 43 3 3 Opbouw 43 4 Verp...

Страница 39: ...wbaarheid en levensduur van het product V r inbedrijfstelling moet principieel aan alle veiligheids voorschriften en aan de informatie van de fabrikant wor den voldaan Deze handleiding completeert de...

Страница 40: ...zijn speciaal voor onze producten ontwikkeld Eigenmachtige aan en ombouwwerkzaamheden of de toepassing van andere dan originele onderdelen kunnen leiden tot ernsti ge schade aan het product en of tot...

Страница 41: ...men De technische instructies moeten strikt worden opgevolgd Wanneer een machine is uitgeschakeld door een beveili ging mag deze pas weer worden ingeschakeld nadat de fout is verholpen 2 Veiligheid In...

Страница 42: ...bewakingscontroles Onze installaties zijn uitgerust met verschillende veilig heids en bewakingscontroles Deze inrichtingen mogen niet worden gedemonteerd of uitgeschakeld Inrichtingen moeten v r de in...

Страница 43: ...t reservoir en kunnen de pomp zelfs blokkeren De stroomsnelheid moet in de persleiding minstens 0 7 m s bedragen 3 2 Toepassingswijzen De vuilwater opvoerinstallaties zijn ontworpen voor inter mittere...

Страница 44: ...uct ge durende een langere periode worden opgeslagen Houd er echter rekening mee dat de elastomere delen en de coatings onderhevig zijn aan een natuurlijke verbrossing 4 4 Retourneren Producten die wo...

Страница 45: ...bindingsmanchet van de opvoerinstallatie Plaats de WC voor de kunststof box en schuif het WC aan sluitstuk in de verbindingsmanchet van de installatie Let er daarbij op dat de opvoerinstallatie niet w...

Страница 46: ...Anschluss Druckleitung Index nderung Datum Name Datum Name HOMA Pumpenfabrik GmbH Industriestra e 1 53819 Neunkirchen Seelscheid Tel 49 0 2247 702 0 E Mail info homa pumpen de Oberfl chenangaben DIN...

Страница 47: ...ir het inschakelniveau heeft bereikt Als het peil het uitschakel niveau bereikt wordt de pomp uitgeschakeld 6 Onderhoud 6 1 Algemeen De complete installatie moet regelmatig worden gecon troleerd en on...

Страница 48: ...ronica defect Vervanging door vakper soneel Snijdwerk verstopt Motoras met een schroevendraaier links en rechtsom draaien zie afbeelding Motor draait pomp werkt niet Persleiding verstopt geknikt Reini...

Страница 49: ...contact op met de klantenservice Deze kan u als volgt verder helpen Telefonische en of schriftelijke ondersteuning door de klantenservice Ondersteuning ter plaatse door de klantenservice Controle en o...

Страница 50: ...50 Notizen Notes...

Страница 51: ...edingte Kontaminierung des Ger tes toxisch nein ja welche Stoffe tzend nein ja welche Stoffe mikrobiologisch nein ja welche Stoffe explosiv nein ja welche Stoffe radioaktiv nein ja welche Stoffe sonst...

Страница 52: ...the instruments toxic no yes substance corrosive no yes substance microbiological no yes substance explosive no yes substance radioactive no yes substance other substances no yes substance Legally bi...

Страница 53: ...i res corrosives non oui substance mati res micro biologiques non oui substance mati res explosives non oui substance mati res radioactives non oui substance autres substances non oui substance D clar...

Страница 54: ...tourneren Contaminatie van het apparaat als gevolg van de toepassing giftig nee ja welke stoffen bijtend nee ja welke stoffen microbiologisch nee ja welke stoffen explosief nee ja welke stoffen radioa...

Страница 55: ...ased the equipment or manufacturer of the equipment Avis DEEE La directive sur les d chets d quipements lectriques et lectroniques DEEE qui est devenue applicable comme loi europ enne le 13 f vrier 20...

Страница 56: ...702 0 Fax 49 0 2247 702 44 e Mail info homa pumpen de Internet www homa pumpen de Industriestra e 1 53819 Neunkirchen Seelscheid Telefon 49 0 2247 702 0 Fax 49 0 2247 702 44 e Mail info homa pumpen de...

Отзывы: