32 | EngliSH
BA V2.0 01052020
Wiring diagram – PCM15/25, three-phase version, 3 x 400/230 V
rt
sw
PE
probe
Alarm 230VAC
3~N 50/60Hz 400V\230V
fuse max. C25A
PE
N
L3
L2
L1
Pilot tube
Thermo- switch
1
3
5
PCM15/25-D V2.0
1
3
5
Input
MCB
L3.1
L3.2
A1
A2
A2
A1
L1
L2
L3
N
1
3
alarm/high water
Remote
P1
P2
alarm/high water
NO
NC
COM
Input 4-20mA
P
2
4
6
N
PE
L3
2
4
6
9
9
5
3
1
10
10
6
6
7
7
PE
PE
N
15
15
16
16
5
5
4
4
8
8
17
17
1
1
2
2
3
3
17
3
4
1
2
3
4
1
2
HW
4-20mA +
-
Intrinsically
save
(Option)
230VAC
5A
PE
Thermo- switch
Input
MCB
2
fault
2
4
6
+
-
T
T
T
T
seal monitoring
P2
P1
TS
dryrunning
level
F1
Alarm
High Water
Compressor
230VAC
or
3
M
temp. switch
T
T
U
V
W
PE
pump 1
3
M
temp. switch
T
T
U
V
W
PE
pump 1
Содержание PCM Series
Страница 15: ...DEUTSCH 15 BA V2 0 01052020 11 Anhang ...
Страница 31: ...EngliSH 31 BA V2 0 01052020 11 Appendix ...
Страница 34: ......