9
Assembly of the fuse:
Now the fuselage tube can be joined to the fuselage boat.
The wing support is checked once again for protrusions to ensure a flat support surface for
the wing center section.
Rudder and elevator
90 degrees
Elevator and auxiliary
rail parallel
Insert R5 and fix it with
a clamp
Support 1cm before
the end of the pipe