3 - 5 mm 3 - 5 mm 6 - 8 mm
length
model
7
2 mm
(28.03 in)
768 mm
(30.24 in)
030 mm
(40.55 in)
Riga S II
4
7
Riga S III
4
Riga S IV
4
4
3 - 5 mm 3 - 5 mm 6 - 8 mm
length
model
768 mm
(30.24 in)
030 mm
(40.55 in)
030 mm
(40.55 in)
Riga III
4
Riga IV
4
4
Riga V
4
6
3
Additional notes for assembly:
Wedge seals (V23)
Pull them apart at the center.
After greenhouse is assembled, p
ush the seal 3 - 5 mm between the soil
profile and the glazing
on the inside of the greenhouse
!
Important: Compress the seals when you install them as they contract in
cold weather
If forgotten,
bolt heads
can also be
inserted later in the plastic
at the
bottom of the door frame and top or
bottom of curved aluminum extrusions.
You may also create your own insertion
point as needed with a 1/2" drill bit.
This will not compromise the integrity of
the structure.
Quantity
of wedge seals
pos.4-2
pos.4-
pos.3-3
pos.
-5-6
pos.2-
pos.2-3.
pos.2-3.
pos.
-
pos.
-9
pos.
-9
pos.
-5-4
pos.
-5-4
pos.
-5-6
pos.
-7
pos.
-6
pos.
-8
pos.3-2
IMPORTANT!
Quantity of cartons
basic construction
(gable/eaves)
curved center
profile
windows/
doors
glazing
Riga S/II/III/IV
Riga III/IV/V
Start with the box labeled "basic kit". Please
open one box at a time to avoid
confusing the parts.
Before you begin assembly of a section
,
check the parts list for that box and make sure all parts
are present. Parts lists are provided in every box. The boxes go through a quality check before
they are closed, thus missing parts are rare. Should any parts be missing please call
Exaco
customer service
at 877-760-8500 or [email protected].