1
glazing
Edge curve
right - (pos..5.6)
Edge curve
left - (pos..5.4)
Edge curve connects to the soil profile corner (V9)
The rear gable is assembled in the same way!!!
glazing
Only rear gable!
cross bar
(Pos.
.8)
step 5
to step 5:
The square peg in the soil profile
corner (V9) is plugged into the bottom
of the Edge curve (pos.1.5.4/1.5.6).
The small triangular glazing is
positioned in the door frame top (pos
1.8)
The Edge curve (pos.1.5.4/1.5.6) is
attached to the door frame using the
connecting plate (V5), installed in step
4, and 2 screws pan head 4,2 x 13
(S9).
Insert 2 bolts into the channel
of each edge curve for attaching
lateral support later.
All fasteners should be hand tight.
- See also step 4! -
step 6:
to step 6:
The cross bars (pos..9) are
mounted horizontally with the
pan head screw 4,8
x 45 (S3).
step 7:
view from outside
to step 7:
Slide
the upright profiles (pos 1.6/1.7) into
the soil profile.
Insert
the (787 x 728 mm) glazing between
the upright profiles (pos 1.6/1.7)
Insert
one M6 x 16 (S5) into each upright
profile (pos 1.6/1.7)
Insert
four
M6 x 16 (S5) into the cross bar
(pos 1.8)
Insert
one M6 x 16 (S5) into each cross bar
(pos 1.9)
Connect
the upright profiles (pos 1.6/1.7) to
the cross bars (1.8/1.9) with connecting
plates (V10)
Attach
the edge curve left/right (pos.1.5.4/
1.5.6) to the cross bars (1.9) with the pan
head screw 4,8 x 45 (S13).
Insert 2 bolts
into the channel of each edge curve for
attaching lateral support later.
view from
outside
x
M6x
6
4x
M6x
6
x
M6x
6
connecting
plate (V
0)
Assembly procedure gable
ATTENTION!
When using a foundation frame attach it to soil profile in advance (see pages 5, 6)