![Hohner ECONOMY 25/40 Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/hohner/economy-25-40/economy-25-40_operating-instructions-manual_2144652039.webp)
Operation
Hohner Maschinenbau GmbH
ECONOMY 25/40 02/2016
39
4.11 Loop stitching with economy 25/40
- Move the main slide bar -22- so that the axle -51- on the right side of the stitching head is acces-
sible. Do this using the hexagon socket screw key -5-, size 5 from the tool-set. Insert it in the cylin-
drical screw at the back of the drive motor and turn in the direction of the arrow, pushing the fan
lever -7- simultaneously.
- Relieve the roller tappet -52- with the holding clip -53-.
When changing the benders for "loop-stitching", it is essential to replace coarse.
- Pivot the leaf spring -19- and remove the finger guard -20-.
- Fine benders are required for loop-stitching. Remove coarse benders, right and left, and replace
them with fine benders, left -55- and right -56-. Loosen the hexagon socket set screw -57- in front
of the main slide bar using the round screw hook -54-, then pull out the axle -51- laterally.
- Now remove the shoe tongue backwards.
- Introduce shoe tongue -58- for loop-stitching from behind, push the axle -51- in again and
retighten the hexagon socket set screw -57-.
- Insert the driver -59- for loop-stitching and the switch finger -25-.
Ensure that
the switch finger is
screwed into the upper thread by the driver.
- Tighten both benders, left -55- and right -56-, securely. Both benders are now located close to the
lateral surfaces of the main slide bar -22-.
- Before switching the machine on, please turn the motor once by hand for a final check, than
relieve the roller tappet -52- with the holding clip-53-.
TIP
Содержание ECONOMY 25/40
Страница 2: ...2 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Страница 4: ...4 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Страница 12: ...Description of the ECONOMY 25 40 12 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Страница 18: ...Installation and commissioning of the machine 18 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Страница 20: ...Operation 20 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 1 9 16 10 45 11 12 13 11 14 15 8 On Off...
Страница 22: ...Operation 22 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 2 9 16 45 15 17 33 32 18 20 21 X 17...
Страница 24: ...Operation 24 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 3 18 18 18 18...
Страница 26: ...Operation 26 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 4 38 18 37 39 42 41 8 36 35...
Страница 28: ...Operation 28 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 5 20 26 29 28 14 21 31 30...
Страница 30: ...Operation 30 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 6 19 22 21 20 23 24 25 67b 67a 59 67b 67a 59...
Страница 32: ...Operation 32 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 7 21 46 50 49 45 47 48...
Страница 34: ...Operation 34 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 8 Fig 4 9 43 43...
Страница 40: ...Operation 40 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 13...