![Hohner ECONOMY 25/40 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/hohner/economy-25-40/economy-25-40_operating-instructions-manual_2144652019.webp)
Operation
Hohner Maschinenbau GmbH
ECONOMY 25/40 02/2016
19
4 Operation
4.1
Stitching wire
The ECONOMY 25/40 processes stitching wire of standard quality
Round wire No. 21 - 30 (diameter 0.80 - 0.35 mm)
Flat wire No. I - VI (0.70 x 0.35 to 0.96 x 0.78 mm)
Thumb rule
The thicker the material to be stitched, the thicker the wire, but it should be not thicker than neces-
sary. A wire that is too thick is not aesthetically pleasing, but a wire that is too thin will result in mis-
takes!
Stitching wire - round or flat?
Very thin folders of just a few sheets are usually stitched with round wire no. 30 or 28. The selection
of round or flat wire is dictated by experience and economy (round wire is cheaper). Blocks of 18
mm thickness can be stitched with either round or flat wire. For thicknesses over 18 mm, we recom-
mend flat wire in principle.
Stitching wire index
Stitching
thickness
from approx.
to approx.
Round wire
no.
Flat wire no.
Occasionally you might
need a stronger type of
wire, e.g. when working with
very hard paper or in case
of blunt cutters, which
weaken the driving power of
the staples.
2 sheets
1 mm
30
-
2 sheets
2 mm
28
-
2 sheets
4 mm
26
-
2 mm
6 mm
25
-
6 mm
10 mm
23
III
10 mm
14 mm
22
IV
14 mm
18 mm
21
V
18 mm
25 mm
-
VI
Содержание ECONOMY 25/40
Страница 2: ...2 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Страница 4: ...4 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Страница 12: ...Description of the ECONOMY 25 40 12 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Страница 18: ...Installation and commissioning of the machine 18 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Страница 20: ...Operation 20 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 1 9 16 10 45 11 12 13 11 14 15 8 On Off...
Страница 22: ...Operation 22 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 2 9 16 45 15 17 33 32 18 20 21 X 17...
Страница 24: ...Operation 24 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 3 18 18 18 18...
Страница 26: ...Operation 26 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 4 38 18 37 39 42 41 8 36 35...
Страница 28: ...Operation 28 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 5 20 26 29 28 14 21 31 30...
Страница 30: ...Operation 30 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 6 19 22 21 20 23 24 25 67b 67a 59 67b 67a 59...
Страница 32: ...Operation 32 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 7 21 46 50 49 45 47 48...
Страница 34: ...Operation 34 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 8 Fig 4 9 43 43...
Страница 40: ...Operation 40 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 13...