Operation
Hohner Maschinenbau GmbH
ECONOMY 25/40 02/2016
37
4.10 Table adjustment for pads and folders
4.10.1 Pad stitching
- Fig. 4.10 -
- For pad stitching, the stitching table -60- must be level, the guiding ruler -61- and both limit
stops -62-, right and left, are screwed on by means of the knurled screws -63-.
- Mount the finger guard in the "
pad stitching
" position and note the markings
4.10.2 Folder stitching
- Fig. 4.11 -
For folder stitching, the stitching table -60- must be set oblique (saddle-like).
- Unscrew the guiding ruler -61- and both limit stops -62- on the right and left, otherwise the plexi-
glass finger guard -20- will break. Hold the stitching table with your left hand, whilst your right
hand is pulling the cylinder stop lever -64-.
- Now move the table forward into saddle position.
The guiding ruler -61- is not used if you are working in saddle-like position.
- Insert the round ended sunk key -65- in synthetic-resin-compressed wood into the stitching table
as a protection.
- Mount the finger guard in the "
folder stitching
" position and note the markings
Содержание ECONOMY 25/40
Страница 2: ...2 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Страница 4: ...4 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Страница 12: ...Description of the ECONOMY 25 40 12 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Страница 18: ...Installation and commissioning of the machine 18 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Страница 20: ...Operation 20 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 1 9 16 10 45 11 12 13 11 14 15 8 On Off...
Страница 22: ...Operation 22 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 2 9 16 45 15 17 33 32 18 20 21 X 17...
Страница 24: ...Operation 24 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 3 18 18 18 18...
Страница 26: ...Operation 26 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 4 38 18 37 39 42 41 8 36 35...
Страница 28: ...Operation 28 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 5 20 26 29 28 14 21 31 30...
Страница 30: ...Operation 30 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 6 19 22 21 20 23 24 25 67b 67a 59 67b 67a 59...
Страница 32: ...Operation 32 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 7 21 46 50 49 45 47 48...
Страница 34: ...Operation 34 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 8 Fig 4 9 43 43...
Страница 40: ...Operation 40 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 13...