56
General Maintenance
•
Check the bypass valve and make sure it is
operating properly.
Periodic:
•
Service the pump as recommended in the
pump operating manual. Change crankcase
lubricating oil after the first 100 hours and
every 500 hours thereafter.
Important:
Make sure to install the safety plug in crank-
case drain valve when draining is complete.
The safety plug prevents crankcase oil from
draining if the valve is accidentally opened.
•
Check pulley clearances and drive belt tension
at least once each month.
•
Check and tighten all mounting bolts and
hardware.
• Inspect all hoses and fittings weekly for signs
of deterioration, chaffing and leaks. Repair or
replace as necessary.
•
Inspect and lubricate ball valves periodically.
Make sure to open and close all ball valves at
least once each month to keep them free and
operating properly.
•
Inspect and lubricate the manual bypass valve
to keep it operating properly.
Charge Pump
The charge pump is the flexible impeller type and
is mounted directly to the engine. The pump can-
not run dry and the impeller will be damaged in
seconds if the water flow to the pump is stopped
for any reason.
Information and an owner’s manual for the charge
pump are included with this manual. Refer to this
information for additional operation and service
data.
Routine Maintenance:
Daily:
• Inspect the charge pump, hoses and fittings for
leaks and signs of wear or deterioration. Any
questionable or leaking components should
be repaired or replaced before operating the
system.
UHP Pump Oil Sump Level Indicator and Oil Fill
Oil Level
Oil Fill
UHP Pump Oil Sump Drain Valve and Safety Plug
Charge Pump On Engine
Содержание Stripe Hog SK3000
Страница 1: ...3 K Operations Manual...
Страница 2: ...2...
Страница 14: ...14 THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 62: ...62 THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 77: ...77 Component Repair HOG TECHNOLOGIES...
Страница 79: ...79 Component Repair HOG TECHNOLOGIES...
Страница 81: ...81 Component Repair HOG TECHNOLOGIES...
Страница 82: ...82 NOTES...
Страница 83: ...83 JETSTREAM UHP PUMP FLUID END Drawings and Schematics Appendix A HOG TECHNOLOGIES...
Страница 86: ...86 THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 90: ...90 THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 92: ...92 THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 104: ...104 THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 107: ...107...