![HME 6700HD Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/hme/6700hd/6700hd_installation-instructions-manual_2141478023.webp)
EQUIPMENT INST
ALLA
TION
16
5.4 Router Installation
Mount the Routers close enough to the pull boxes in order to be reached by the cables pulled
into the building from the outside. They must be close enough to AC electrical outlets for the
power, or the adapter cables will need to be extended.
1. Hold the enclosed Router mounting template against the wall at the desired location, and mark
the wall through the four screw hole targets on the template.
2.
Remove the template from the wall, and drill four 3/16” holes in the wall at the marked spots.
3. Insert the four enclosed screw anchors into the holes.
4. Insert the four enclosed screws through the plastic shoulder washers and into the screw
anchors, and tighten them to secure the shoulder washers against the anchors.
5. Replace the circuit board and all eleven screws.
6. Position the Router unit over the four screws on the wall, so the screw heads go into the four
holes on the back of the Router (Figure 8).
7. Slide the unit downward to secure it in place.
Figure 8. Power supply connection to base station
Sections
Содержание 6700HD
Страница 1: ...SYS6700HD Drive Up Communication System Installation Instructions HME 400G754 Rev D 4 26 17...
Страница 2: ......
Страница 7: ......
Страница 18: ...EQUIPMENT INSTALLATION 11 Figure 3 Typical equipment locations Sections 1 2 3 4 5 6 7 8 9 10 11 12...
Страница 62: ...SYSTEM 6700HD BLOCK DIAGRAM Figure 18 System 6700HD Block Diagram 55...
Страница 63: ...Figure 19 RS485 Digital Communications Link RS485 DIGITAL COMMUNICATION LINK 56 56...
Страница 68: ...Figure 24 Power Supplies WIRING DIAGRAM FOR POWER SUPPLIES 61 61...