Regular checks shall be performed (at least once a month) regarding tightness of door and
connection.
At least once a year the check shall be performed regarding performance of STB temperature
limiter.
Boiler shall be installed only in spaces intended for that purpose, provided with required equipment
and meeting relevant standards.
Spaces where boiler operation follows shall be provided with a plate warning against smoking and
use of open flames. Boiler room shall be fitted with operative extinguisher.
Ventilation and air supply system of boiler room shall be operative and in conformance with
relevant standards.
Boiler room shall be protected against access of unauthorized persons, in particular children.
Under any circumstances do not remove or shut down any measuring instrumentation and
protective devices.
During boiler operation and ash removal, protective clothing and individual protection means are
required: gloves, goggles, face mask and working clothing.
When hot water temperature is over 60ºC always arrange for mixing with cold water to prevent risk
of scalding.
Always provide bleeding appropriate for the boiler and the system.
Before fuel loading using the vehicle, firstly put out the boiler.
For repairs and replacement use original spare parts only.
SMART FIRE BOILER User Manual
Page 4/55