background image

 

 
 

 

LOGICA 17-150kW 

www.cichewicz.com 

With us heating makes economies! 

 

 

 

 
 
 

 

Manual and Installation 

book of boiler 

 

Summary of Contents for Logica 100-110

Page 1: ...LOGICA 17 150kW www cichewicz com With us heating makes economies Manual and Installation book of boiler ...

Page 2: ...contents 1 Advantages of LOGICA 3 2 Short description 3 3 Technical data 4 3 Technical data 9 5 Błąd Nie można odnaleźć źródła odwołania Błąd Nie zdefiniowano zakładki 4 Control 9 4 Control 9 4 Control 9 www cichewicz com With us heating makes economies ...

Page 3: ...oiler is made from the special steel 5 8mm Possibility of burning the worst quality of solid fuel Full automatic burning process Big loading doors Steering with the room thermostat The possibility of burning the worst quality of fuel 14 nozzles provides excellent burning process Big cleaning doors Long heat exchanger with three pass building provides longer burning time Model 17 20 20 27 30 38 ser...

Page 4: ... fluegases o C Coal 180 240 Wood 220 340 Temp of the fluegases by the nominal Power o C 100 140 0 Efficiency Class Emission Class EN 303 5 Heating efficiency class 3 Pollution class 1 Mass flow of fluegases Wood kg s 0 014 0 019 0 026 0 033 0 04 0 054 0 076 0 105 0 0042 0 0056 0 0079 0 01 0 012 0 016 0 023 0 0315 Coal kg s 0 022 0 027 0 042 0 00055 0 068 0 094 0 13 0 165 0 0066 0 0082 0 0013 0 017...

Page 5: ...ty of fuel At the back side of combustion chamber is installed mechanical movement cast iron grill 3 2 Special features of Logica 1 Full automatic burning process 2 Controller with room thermostat 3 14 nozzles deliver fresh air on temp request to combustion chamber 4 Overheating protection system STB 5 Connection to central heating pump 6 Wide program settings depended on different fuel 7 Big revi...

Page 6: ...0 2100 2200 3150 D 760 760 950 1035 1115 1270 1270 1370 1460 1930 E 255 255 255 270 270 400 400 400 430 360 F 220 220 215 230 230 360 360 360 230 310 G 930 930 1120 H 920 920 1120 a 1 2 2 2 2 2 2 2 rys rys b 1 2 2 2 2 2 2 2 rys rys c 3 4 3 4 d 160 160 195 235 235 285 285 285 298 rys e Gw Gw Gw f Gz Gz Gz Loading door corssection 210x290 210x340 210x390 210x440 210x490 300x400 300x500 300x600 300x6...

Page 7: ... 7 Logica 40 58kW Logica 78 110 kW Logica 150 kW ...

Page 8: ... 8 Logica 230 kW Logica 350 400 kW ...

Page 9: ... T Ts 45 Ts Ts T 31oC Phaze of emblazing Automatic work Blanking Ts set temperature 4 Controller RK 2001W standard controller Schematic diagram of work ventilator H speed maximum speed of ventilator d d speed near blowthroughs E work work P work P work ventilator pause pause pause c c c T Ts T Ts 45 Ts Ts T 31oC Phaze of emblazing Automatic work Blanking Ts set temperature ...

Page 10: ...ts in the rear of the controller The temperature sensor should be placed in a measurement hole in the boiler CAUTION Before plugging in the controller check if the wiring system is properly grounded and if the terminal screws of the output connector are properly screwed CAUTION A fan and a central heating pump of maximum power of 450W can be connected to the controller CAUTION As additional option...

Page 11: ... service mode the display shows water temperature in the boiler and the last character on the display defines the mode which the controller is currently in for example 50º STOP mode 50ºC WORK mode 50ºc hold up of burning in WORK mode 50ºU heating of hot water in SUMMER mode 50 u hold up of burning in SUMMER mode 50ºd total bacteria control heating up of hot water up to 75ºC Setting up the user par...

Page 12: ...ting can be turned off by choosing the value with the button which means turning off the central heating pump 3 Total bacteria control in the hot water tank heating up the controller allows to manually launch the total bacteria control process in the boiler Choosing the d value with button starts the process in which the boiler is trying to achieve the temperature of 75 C in the hot water tank In ...

Page 13: ...r 0 10 50 100 10 100 r 1 automatic fan speed control and time of fan start 0 10 1 1 n 5 Fan work time 5 60 1s 5 u 6 Fan pause time 1 99 1min 6 P 40 Central heating pup launch temperature 30 70 1 C 40 Ph 2 Central heating pup launch hysteresis 1 10 1 C 2 Pc 2 Pause time of central heating pump with 30 sec work periods 1 99 1min 2 u 50 Tap hot water desired temperature 30 60 1 C 50 uh 5 hot water he...

Page 14: ...e in WORK mode Fan pause time Nu 6 time between fan work periods 2 Central heating pump work parameters Central heating pump launch temperature P 40 the value of temperature of the water in the boiler which causes start of the central heating pump Central heating pump works independently from the control process and is launched additionally in case of boiler overheat Central heating pump launch hy...

Page 15: ...ly when temperature decreases below this temperature Fan turn off also occurs in case of damage of the boiler temperature sensor which is shown on the display with error E 1 STB the controller has additional protection against overheating which is independent from the processor In case the temperature increases over 95 C the control process is turned off by turning the fan off and launching the ce...

Page 16: ...ut testing To make checking the controller work easier it is possible to test output circuits which control the fan and the pump and the additional boiler launching system This function is available in service mode only if the control process is off i e the controller was in STOP mode before switching to service mode By choosing outP on the display and pressing OK button you can turn on the centra...

Page 17: ...ing in the boiler and contact the service When E 1 error appears on the display it means fault in the boiler sensor circuit or temperature below 0 C E 2 is displayed if boiler overheats E 3 error means fault and overheating at the same time Appearing of E 1 error on the display after erasing it by pressing STOP button in spite of temperature decreasing below 90 C may mean permanent damage of boile...

Page 18: ...ler overheating protection 90 99 C 1 C Hardware boiler overheating protection STB 95 C 1 C Central heating pump launch temperature 30 70 C 1 C Hot water temperature adjusting range 30 60 C 1 C Total fan out total max 2A 230V Dimensions HxWxD 80x170x100 mm Notes Display Parameter User 100 Fan max work power or max power when r 0 10 r 1 automatic fan speed control and time of fan start n 5 Fan work ...

Page 19: ...aught is 0 1 0 2 mbar Installation according to ADJ does entail some testing of the chimney which may be carried out by a sweep Important sources of guidance installers 98 37 EEG 89 336 EEG 73 23 EEG EN 55014 1 1993 A1 1997 EN 55014 1 EN 55014 2 C1 1998 EN 61000 3 2 EN 61000 4 2 3 4 5 6 11 Level2 EN 50165 EN 50165 C1 EN 60335 1 EN 303 5 EN 12809 EN 13394 6 2 Localization of the boiler Placing on f...

Page 20: ...or it s stocking is the most frequent cause of incorrect work of boiler the fumidity condense water impossibility of higher temperature obtainment Ventilation outlet has instead in task of offtake from room used air and harmful gases In boiler room with chimney with natural draught it is not it allowed to use mechanical ventilation 6 4 Chimney connection 1 Cleaning door Revision door 2 Insulation ...

Page 21: ...of brick between duct and wall should not be smaller than 12 cm Chimney should be led out over roof The location of chimney outlet depends from the degree of roof droop and stages of the flammability The roof with angle of droop to 12º the chimneys should stand over roof ridge 0 6m roof with angle of droop over 12º the chimneys should stand over roof ridge in case of easily flammable coverings 0 6...

Page 22: ... 22 7 Parts ...

Page 23: ...oors L18 Aerial duct L19 Aerial tube L20 Isolation from mineral wool L21 Isolating casing from sheet metal 0 8 mm L22 Cantilever angle profiles to assembly of casing of isolation L23 Return from screwed pipe 1 5 or 2 L24 Element to assembly of thermostat L25 The flue connection L26 Screwed bolt to assembly of upper cleanout L27 Upper cleanout L28 Ceramic upper plate L29 The butterfly nut to assemb...

Page 24: ...xample for 20kW boiler we need accumulation tank c a 1000 L PI MN Naczynie wzbiorcze RS RP RO RB RW RW RB ZRC ZT OBIEG GRZEWCZY GRZEJNIKOWY F ZZ Pco F ZZ Pco SZ OBIEG GRZEWCZY PODŁOGOWY CTco ZTM zasobnik c w u F ZZ RC CTcwu cwu zwu KS MN Pcwu F CTco UMS4 CTco CTz UMS 1 regulator kotła The water return should be kept always under 60ºC ...

Page 25: ... of the dirties on the boiler s walls means minimum 5 higher fuel consumption and lower efficiency To clean logica it must be removed steel cover from the up and by the steel brush should be cleaned vertical canals Ash will goes down and through the lower revision door it must be taken away Cleaning example Logica 17 38 ...

Page 26: ...covered by this guarantee The following boiler s components varnish coat cast iron elements and movable elements shall be covered with a 12 month producer s guarantee The guarantee does not cover operating components such as sealant gaskets and chamotte bricks Boiler s burner automatics and electrical fittings shall be covered with a 24 month guarantee Electric connection to the boiler executed by...

Reviews: