MAINTENANCE
7-22
Swing Bearing
--- every 250 hours
d
CAUTION: Lubricating both the swing bearing and
gear and rotating the upperstructure must be done by
one person. Before you lubricate the swing bearing,
clear the area of all persons. Lower the bucket to the
ground. Stop the engine. Pull the pilot control shut-off
lever to the LOCK position.
1. Park the machine following the same procedures as
described on page 7-7 for preparation for inspection and
maintenance.
2. Apply grease via grease fitting (1) with a grease gun by
two to three strokes.
3. Start the engine. Push pilot control shut-off lever to the
UNLOCK position. Raise the bucket approx. 200 mm (8
in) above the ground and rotate the upperstructure 90 °
(1/4 turn).
4. Lower the bucket to the ground.
5. Repeat the procedure (Step 1 to 4) 8 times.
6. Apply grease to the swing bearing until grease can be
seen escaping from the swing bearing seals. Take care
not to supply excessive grease.
1
MADB-07-009
Содержание Zaxis 33U-5A
Страница 4: ......
Страница 10: ...MACHINE NUMBERS 2 Engine TYPE MFG NO Travel Motor TYPE MFG NO MADB 00 020 MADC 00 010 M1M0 00 004 ...
Страница 11: ...MACHINE NUMBERS 3 Swing Motor TYPE MFG NO ZX65USB 5A ZX33U 5A 38U 5A 48U 5A 55U 5A MADB 00 005 MADC 00 001 ...
Страница 57: ...SAFETY SIGNS S 45 SS4604981 MADG 00 007 ZX33U 5A 38U 5A ZX65USB 5A ZX48U 5A 55U 5A MADB 00 010 MADC 00 012 ...
Страница 66: ...SAFETY SIGNS S 54 MEMO ...
Страница 104: ...OPERATOR S STATION 1 38 Radio Cab equipped machine Optional 1 Radio Clock 1 MADB 01 005 ...
Страница 114: ...BREAK IN 2 2 MEMO ...
Страница 160: ...OPERATING THE MACHINE 5 28 MEMO ...
Страница 270: ...MAINTENANCE 7 102 MEMO ...
Страница 272: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Страница 274: ...STORAGE 10 2 MEMO ...