![Hitachi Summit RAC-50YH5 Скачать руководство пользователя страница 70](http://html.mh-extra.com/html/hitachi/summit-rac-50yh5/summit-rac-50yh5_service-manual_2139441070.webp)
– 82 –
5. Reversing valve control circuit
Reversing valve control circuit can switch reversing valve ON/OFF according to instruction from indoor
microcomputer depending on the operation condition shows in Table 5-1.
Voltage at each point in each operation condition is approximately as shown below when measured by
tester. (When collector voltage of Q701 is measured)
3
1
16
24
I/F 0V
0V
Fig. 5 Ð 1
D702
CN2
Q701
DC voltmeter
or tester
Reversing
valve
R701
R703
R219
Q705
FUSE RESISTOR
R
ET
U
P
M
O
C
O
R
CI
M
PQ701
1
2
3
4
5V
HIC
I/F 35V
R702
V
Operation condition
Collector voltage of Q701
Cooling
Heating
Dehumidifying
General operation of Cooling
In normal heating operation
MAX. rotation speed instructed
by indoor microcomputer after
defrost is completed
Defrosting
Sensor dry
About 35V
About 0.8V
About 0.8V
About 35V
About 35V
Table 5-1
Содержание Summit RAC-50YH5
Страница 32: ... 30 CONSTRUCTION AND DIMENSIONAL DIAGRAM MODEL RAS 50FH5 INDOOR UNIT 47 5 60 205 220 ...
Страница 38: ...MODEL RAS 50FH5 CIRCUIT DIAGRAM 39 ...
Страница 39: ...CIRCUIT DIAGRAM MODEL RAC 50YH5 41 ...
Страница 41: ... 44 MODEL RAS 50FH5 RECEIVING P W B MARKING ON P W B COMPONENT SIDE SOLDERING SIDE ...
Страница 42: ... 45 MODEL RAC 50YH5 MAIN P W B Marking on P W B E D I S T N E N O P M O C ...
Страница 45: ... 51 ...
Страница 91: ... 103 SELF DIAGNOSIS LIGHTING MODE MODEL RAC 50YH5 ...
Страница 109: ... 121 PARTS LIST AND DIAGRAM INDOOR UNIT MODEL RAS 50FH5 ...
Страница 113: ...RAS 50FH5 RAC 50YH5 HITACHI PM NO 0364E Printed in Malaysia ...