![Hitachi Summit RAC-50YH5 Скачать руководство пользователя страница 29](http://html.mh-extra.com/html/hitachi/summit-rac-50yh5/summit-rac-50yh5_service-manual_2139441029.webp)
– 27 –
3. MAINTENANCE AT BEGINNING OF LONG OFF PERIOD
●
Run the unit by setting the operation mode to
(COOL), the temperature to 32
°
C and the fan speed
to HI for about half a day on a fine day, and dry the
whole of the unit.
●
Switch off the power plug.
1
2
3
REGULAR INSPECTION
PLEASE CHECK THE FOLLOWING POINTS BY QUALIFIED SERVICE PERSONAL EITHER
EVERY HALF YEARLY OR YEARLY. CONTACT YOUR SALES AGENT OR SERVICE SHOP.
Is the earth line disconnected or broken?
Is the mounting frame seriously affected by rust and is the
outdoor unit tilted or unstable?
Is the plug of power line firmly plugged into the socket?
(Please ensure no loose contact between them).
Air
Blow
Cleaning and maintenance must be carried out only by qualified service personal. Before cleaning,
stop operation and switch off the power supply.
!
CAUTION
Confirm
Содержание Summit RAC-50YH5
Страница 32: ... 30 CONSTRUCTION AND DIMENSIONAL DIAGRAM MODEL RAS 50FH5 INDOOR UNIT 47 5 60 205 220 ...
Страница 38: ...MODEL RAS 50FH5 CIRCUIT DIAGRAM 39 ...
Страница 39: ...CIRCUIT DIAGRAM MODEL RAC 50YH5 41 ...
Страница 41: ... 44 MODEL RAS 50FH5 RECEIVING P W B MARKING ON P W B COMPONENT SIDE SOLDERING SIDE ...
Страница 42: ... 45 MODEL RAC 50YH5 MAIN P W B Marking on P W B E D I S T N E N O P M O C ...
Страница 45: ... 51 ...
Страница 91: ... 103 SELF DIAGNOSIS LIGHTING MODE MODEL RAC 50YH5 ...
Страница 109: ... 121 PARTS LIST AND DIAGRAM INDOOR UNIT MODEL RAS 50FH5 ...
Страница 113: ...RAS 50FH5 RAC 50YH5 HITACHI PM NO 0364E Printed in Malaysia ...