
10.6.4 Commissioning
Under the commissioning menu it is possible to adjust the several parameters:
Screed Drying:
•
Circuit 1 setting temperature
• Circuit 2 setting temperature
• Start screed drying
10.6.5 About
In this section of the LCD controller it is possible to find the following information:
System information:
• Type
• Modules type
• System capacity
•
Controller firmware
•
Indoor PCB firmware
•
Language package
Contact information:
It is possible and
recommendable to fill this
information providing a contact
phone to the user.
YUTAKI CASCADE CONTROLLER ATW-YCC-(01-02)
PMML0575 rev.2 - 03/2022
264
Содержание RWH-4.0NFE
Страница 2: ......
Страница 347: ...ENGLISH TYPE 1 5 screws TYPE 2 6 screws 4 Remove the indoor unit lateral cover MAINTENANCE PMML0575 rev 2 03 2022 333 ...
Страница 362: ......
Страница 363: ......