TC-12001
2-119
OUTDOOR UNIT
P5414950-rev.1
43
Liquid Line
Gas Line
Liquid Line Stop Valve
Gas Line Stop Valve
Nitrogen Tank
for Air Tight Test
and
Nitrogen Blow
during Brazing
Vacuum Pump
Manifold
Gauge
Wind tape from outside of
thermal insulation of gas piping
and liquid piping.
Indoor Unit
Thermal Insulation Finishing Work
Cover the flare nut and union of the
piping connection with thermal insulation.
Cover the liquid line
with thermal insulation.
Insulate the liquid pipe for
prevention of the capacity
decrease according to the
ambient air conditions and
dew condensation on the pipe
surface by the low pressure.
Check to ensure that there is
no gas leakage. When large
amount of the refrigerant leaks,
the troubles as follows may occur;
1. Oxygen Deficiency
2. Generation of Harmful Gas
Due to Chemical Reaction
with Fire.
NOTICE
Do not use refrigerant, which is charged to the outdoor unit once, to the air purge. It may cause malfunction
E\WKHLQVXI¿FLHQWUHIULJHUDQW
O
The gas stayed at the screw part of O-ring is
opened and may make sound when removing the
cap. However, it is not gas leakage.
O
Use a charging hose because the check joint can
QRWEHFRQQHFWHGWRWKHÀDUHQXW
O
8VHWKHVSHFL¿HGQRQÀDPPDEOHUHIULJHUDQW
(R410A) to the outdoor unit. Do not charge
material other than R410A into the unit.