Eject Ink
(
Goes to Standby
) [PXR-D、PXR-H]
[Control] - [Eject ink] or [Circulation Control] - [Eject ink]
Start sequence
(
For mentenance
)
Eject Ink
(
Goes to Standby
) [
PXR-P
]
[Control] - [Eject ink] or [Circulation Control] - [Eject ink]
Start sequence
(
For mentenance
)
5.ON
6.ON
ON
1.ON
Suck air in the
nozzle and stir ink
in the tanks
3
ON
4
5
1.ON
2.ON
4.ON
Refresh ink
in the unit
Pressurize
supply path
Suck
circulation
path
5
1
3
ON
5
2.ON
Pump
Step
PXR-D
Sequence Name
Remarks
MV9: Shutoff
Pump
Normal Running
[
PXR-D
、
PXR-H
]
Operation
−
MV4: Agitation
Density control sequence
Step
3
2
Refresh ink
the visco-
meter path
1
10
120
5
2.ON
4.ON
10
MV5: Circulation
MV6: Pressure relief
MV7: Makeup ink
MV8: Cleaning
MV2: Replenishment
MV3: Recovery
2.ON
2.ON
MV1: Supply
3.ON
4.ON
4
360s Max.
30s Max.
5
Ink
replenish-
ment
Makeup ink
replenish-
ment
2.ON
1.ON
3.ON
3.ON
3.ON
2.ON
1.ON
3.ON
ON
2.ON
6
Interval
1800
1
Operation
Remarks
Sequence Name
−
MV1: Supply
MV2: Replenishment
MV3: Recovery
MV4: Agitation
MV5: Circulation
MV6: Pressure relief
MV7: Makeup ink
MV8: Cleaning
MV9: Shutoff
1
Interval
1
2
Pre-heating
15
3.ON
1.ON
2.ON
ON
5
1
3.ON
2.ON
1.ON
ON
6
Eject ink
1
3.ON
1.ON
4.ON
2.ON
7
Suck air in
the nozzle
5
3.ON
5
4.ON
1.ON
5.ON
2.ON
3.ON
1.ON
8
Interval for
stable
pressure
5
2.ON
20
3.ON
9
Standby
−
2.ON
−
1.ON
ON
ON
ON
ON
ON
1.ON
ON
1.ON
3.ON
4.ON
1.ON
PXR-H
Outline
Time [sec.]
1
15
5
6
1.ON
Sequence Name
Operation
Remarks
Step
−
1
2
7
8
4
5
9
10
11
Outline
Interval
Pre-heating
Pressurize
supply path
Suck
circulation
path
Eject ink
Suck air in
the nozzle
Interval for
stable
pressure
Standby
Time [sec.]
Stop stirrer Stir ink in
the tanks
PXR-P
1
5
5
−
15
5
1
3
15
3
20
ON
ON
4.ON
3.ON
1.ON
ON
ON
2.ON
2.ON
3.ON
3.ON
2.ON
2.ON
MV2: Replenishment
MV1: Supply
MV3: Recovery
2.ON
4.ON
4.ON
3.ON
3.ON
MV4: Agitation
2.ON
2.ON
3.ON
1.ON
MV5: Circulation
1.ON
2.ON
MV6: Pressure relief
MV7: Makeup ink
MV8: Cleaning
MV9: Shutoff
1.ON
5.ON
1.ON
1.ON
ON
ON
Pump
ON
ON
MV11: M Stirrer
MV12: S Stirrer
4.ON
4.ON
3.ON
3.ON
1.ON
1.ON
5.ON
ON
ON
ON
ON
6.ON
ON
ON
5.ON
6.ON
MV10: Viscometer
1800
Outline
Time [sec.]
PXR-D
PXR-H
120
5
360s Max.
15s Max.
Ink Viscosity
Measurement
Sequence Name
Normal Running
[
PXR-P
]
Operation
−
5
6
7
9
8
Remarks
Density control sequence
Step
3
4
10
11
Outline
Refresh ink
the visco-
meter path
Ink Viscosity
Measurement
Ink
replenish-
ment
Makeup ink
replenish-
ment
Interval
Time [sec.]
2
PXR-P
120
5
10
360s Max.
15s Max.
1200
1.ON
2.ON
1.ON
MV1: Supply
3.ON
2.ON
2.ON
MV2: Replenishment
MV3: Recovery
4.ON
3.ON
3.ON
3.ON
3.ON
2.ON
3.ON
3.ON
MV4: Agitation
2.ON
4.ON
MV5: Circulation
MV6: Pressure relief
MV7: Makeup ink
2.ON
MV8: Cleaning
1.ON
MV10: Viscometer
4.ON
MV9: Shutoff
4.ON
4.ON
1.ON
5.ON
1.ON
ON
ON
MV11: M Stirrer
MV12: S Stirrer
ON
ON
Pump
ON
4.ON
5.ON
ON
ON
1
Stir ink in
the tanks
5
2.ON
3.ON
3.ON
1.ON
ON
Stop stirrer
3
2.ON
3.ON
Stir ink in
the tanks
5
2.ON
1.ON
1.ON
1.ON
1.ON
ON
ON
Wait stabili-
zation of the
ink level
5
2.ON
Interval
600
2.ON
3.ON
1.ON
ON
5 times
5 times
8-8
Содержание PXR
Страница 1: ...Service Manual HITACHI Printer Model PXR Revision December 2008 Version C ...
Страница 80: ...3 17 3 17 Circuit diagram of EZJ95 ...
Страница 214: ...8 1 8 Attached Drawing 8 1 Circulation System Diagram 8 1 1 Circulation System Diagram PXR D PXR H ...
Страница 215: ...8 2 8 1 2 Circulation system diagram PXR P ...
Страница 216: ...8 2 Air system diagram PXR P 8 3 ...
Страница 217: ...8 4 8 3 Electrical Connection Diagram 8 3 1 Electrical Connection Diagram PXR D ...
Страница 218: ...8 5 8 3 2 Electrical Connection Diagram PXR H ...
Страница 219: ...8 3 3 Electrical connection diagram PXR P 8 6 ...