GR2000 Installation Guide
2-28
GR2K-GA-1002
Rev 6.03
2.4
Device Components
Table 2-1 and Table 2-3 show the maximum number of device components described
in this section, depending on the target GR2000 model.
Table 2-1
Maximum Number of Device Components on Enhanced Models
Device Component
GR2000-2S GR2000-4S GR2000-6H GR2000-10H GR2000-20H
Power Supply Unit (POW)
1
2
2
1
1
Additional POW (POWA)
0
0**
0**
1
1
Basic Control Unit (BCU)
1
1
2
2
2
(a) Main memory
(MS64, MS128, MS256)***
BCU other than
below
2
2
2/BCU
2/BCU
2/BCU
BCU-H850H
BCU-M850H
BCU-L850H
-
-
4/BCU
4/BCU
4/BCU
(b) Memory Card (MC64)
2
2
2/BCU
2/BCU
2/BCU
Pouting Processor (RP)
0*
1
3
5
10
(a) Main memory (MS64)
RP-A1
1
1/RP
1/RP
1/RP
1/RP
RP-C
-
-
0
0
0
RP-D
-
1/RP
1/RP
1/RP
1/RP
RP-C6, RP-D6
-
-
1/RP
1/RP
1/RP
(b) Main memory (MS128) RP-A1
-
-
-
-
-
RP-C
-
-
0
0
0
RP-D
-
0
0
0
0
RP-C6, RP-D6
-
-
1/RP
1/RP
1/RP
Network Interface Unit (NIF)
2
4
6
10
20
Notes:
* One RP-A1equivalent is incorporated in BCU on GR2000-25.
** Power supply redundancy is implemented by installing two POWs on GR2000-4S, 6H.
*** MS256 is dedicated for BCU-H850H, BCU-M850H, and BCU-L850H.
Содержание GR2000 Series
Страница 1: ...Hitachi Gigabit Router GR2000 Series GR2K GA 1002 Rev 6 03 Installation Guide ...
Страница 26: ...GR2000 Installation Guide xxvi GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 42: ...GR2000 Installation Guide xlii GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 54: ...GR2000 Installation Guide liv GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 102: ...GR2000 Installation Guide 2 46 GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 296: ......
Страница 311: ...Figure 5 12 Airflow of GR2000 4 Out left side In right side In upper left side In upper right side In upper rear end ...
Страница 312: ... n upper eft side In upper right side In upper front end ...
Страница 314: ......
Страница 329: ......
Страница 330: ... ...
Страница 338: ... Metal bracket accessory of rack 19 inch rack Interface cable Power calbe ...
Страница 345: ...19 inch Rack GR2000 10H or GR2000 10 Guide Rail ...
Страница 346: ...Each POW is long and heavy approx 520mm deep 8 kg Hold the handle and support the bottom Removing POW Removing Fan Tray ...
Страница 350: ......
Страница 351: ...547 95 177 8 1430 133 35 177 8 ...
Страница 352: ...Open rack Dedicated guide rail edicated bracket supplied with the evice fitting screws Device fitting screw hole ...
Страница 353: ...19 inch Rack GR2000 20H or GR2000 20 Guide Rail ...
Страница 356: ...Metal fittings supplied as accessories M4 screws supplied as accessories NIF side ...
Страница 359: ...Connect both power cables if there is a redundant power supply Power Switch I O ...
Страница 364: ...Breaker switch I O L N Terminal board Front ...
Страница 369: ... Breaker switch I O Front Rear ...
Страница 384: ......
Страница 386: ... ...
Страница 387: ... ...
Страница 388: ... Anchor screw Guide rail ...
Страница 393: ...2 Follow the instructions illustrated in Figure 8 5 I O DC DC unit power switch ...
Страница 395: ...2 Follow the instruction illustrated in Figure 8 7 I O DC DC unit power switch ...
Страница 398: ...POW 2 Follow the instructions illustrated in Figure 8 10 Using the latches ...
Страница 402: ...To add or remove the fan tray for GR2000 20H follow the instructions illustrated in Figure 8 14 Cover Fan tray ...
Страница 405: ...To add or remove the main memory module for RP follow the instructions illustra in Figure 8 17 Installed connector ...
Страница 410: ......