Each GR2000 model can be mounted in a 19-inch rack conforming to JIS and EI
standards. When you choose this style of installation, ensure that the rack and t
router meet the minimum service clearance requirements, the cooling requiremen
and the general rules as previously mentioned. Then, follow one of the procedure
below depending on the scale of the subject model: small, medium, or large.
6.3.4.1
Rack-Mount Installation of Small-Scale Chassis—GR2000-2S, GR2000-4, GR2000-4S,
GR2000-6H
Figure 6-27 to Figure 6-30 show the rack-mount installation of GR2000-2S,
GR2000-4, GR2000-4S and GR2000-6H (unit: mm). The steps are as follows:
1. Prepare the 19-inch rack, considering the dimensions of the router chassis.
The inner depth of the rack must accommodate the depth of the router
chassis plus minimum cable clearance (30mm on the front end for interfa
cables and 70mm on the rear end for power cables). For GR2000-2S/4S/
(depth 480 mm), the inner depth of the rack must be at least 580mm. For
GR2000-4 (depth 600 mm), the inner depth of the rack must be at least
700mm. If a rack with a door is selected, make sure that the distance
between the chassis front end and the inner surface of the door satisfies t
said minimum cable clearance (30mm).
Содержание GR2000 Series
Страница 1: ...Hitachi Gigabit Router GR2000 Series GR2K GA 1002 Rev 6 03 Installation Guide ...
Страница 26: ...GR2000 Installation Guide xxvi GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 42: ...GR2000 Installation Guide xlii GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 54: ...GR2000 Installation Guide liv GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 102: ...GR2000 Installation Guide 2 46 GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 296: ......
Страница 311: ...Figure 5 12 Airflow of GR2000 4 Out left side In right side In upper left side In upper right side In upper rear end ...
Страница 312: ... n upper eft side In upper right side In upper front end ...
Страница 314: ......
Страница 329: ......
Страница 330: ... ...
Страница 338: ... Metal bracket accessory of rack 19 inch rack Interface cable Power calbe ...
Страница 345: ...19 inch Rack GR2000 10H or GR2000 10 Guide Rail ...
Страница 346: ...Each POW is long and heavy approx 520mm deep 8 kg Hold the handle and support the bottom Removing POW Removing Fan Tray ...
Страница 350: ......
Страница 351: ...547 95 177 8 1430 133 35 177 8 ...
Страница 352: ...Open rack Dedicated guide rail edicated bracket supplied with the evice fitting screws Device fitting screw hole ...
Страница 353: ...19 inch Rack GR2000 20H or GR2000 20 Guide Rail ...
Страница 356: ...Metal fittings supplied as accessories M4 screws supplied as accessories NIF side ...
Страница 359: ...Connect both power cables if there is a redundant power supply Power Switch I O ...
Страница 364: ...Breaker switch I O L N Terminal board Front ...
Страница 369: ... Breaker switch I O Front Rear ...
Страница 384: ......
Страница 386: ... ...
Страница 387: ... ...
Страница 388: ... Anchor screw Guide rail ...
Страница 393: ...2 Follow the instructions illustrated in Figure 8 5 I O DC DC unit power switch ...
Страница 395: ...2 Follow the instruction illustrated in Figure 8 7 I O DC DC unit power switch ...
Страница 398: ...POW 2 Follow the instructions illustrated in Figure 8 10 Using the latches ...
Страница 402: ...To add or remove the fan tray for GR2000 20H follow the instructions illustrated in Figure 8 14 Cover Fan tray ...
Страница 405: ...To add or remove the main memory module for RP follow the instructions illustra in Figure 8 17 Installed connector ...
Страница 410: ......