When the hardware installation is complete, you must configure the system to st
operation. The steps are as follows:
1. Login at first time. Log in to this device from the setup console. At the initial lo
attempt, the following appears as the default login account:
Login name:
operator
Password: (none)
To prevent security breaches, it is recommended that you login as the router
administrator (
admin
), create a new account using
adduser
command, and the
delete the default account using
rmuser
command. See
GR2000 Operations Gu
for more information.
2. Set up the configuration information. The configuration information defines t
operating environment, such as the IP addressing, type of network media,
routing protocol, and so on. The configuration information can be defined usi
commands and the GUI. Be sure to save the configuration information to a fi
At startup, the system uses the last-used configuration information file. For
individual commands and parameters, see
GR2000 Configuration Guide.
3. Set up the date and time. The date and time information is used as timestam
for events in the log information and creation of files. Before you start product
use of the router, set the date and time to correct values using
date
command
(see
GR2000 Operations Guide
).
Содержание GR2000 Series
Страница 1: ...Hitachi Gigabit Router GR2000 Series GR2K GA 1002 Rev 6 03 Installation Guide ...
Страница 26: ...GR2000 Installation Guide xxvi GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 42: ...GR2000 Installation Guide xlii GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 54: ...GR2000 Installation Guide liv GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 102: ...GR2000 Installation Guide 2 46 GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 296: ......
Страница 311: ...Figure 5 12 Airflow of GR2000 4 Out left side In right side In upper left side In upper right side In upper rear end ...
Страница 312: ... n upper eft side In upper right side In upper front end ...
Страница 314: ......
Страница 329: ......
Страница 330: ... ...
Страница 338: ... Metal bracket accessory of rack 19 inch rack Interface cable Power calbe ...
Страница 345: ...19 inch Rack GR2000 10H or GR2000 10 Guide Rail ...
Страница 346: ...Each POW is long and heavy approx 520mm deep 8 kg Hold the handle and support the bottom Removing POW Removing Fan Tray ...
Страница 350: ......
Страница 351: ...547 95 177 8 1430 133 35 177 8 ...
Страница 352: ...Open rack Dedicated guide rail edicated bracket supplied with the evice fitting screws Device fitting screw hole ...
Страница 353: ...19 inch Rack GR2000 20H or GR2000 20 Guide Rail ...
Страница 356: ...Metal fittings supplied as accessories M4 screws supplied as accessories NIF side ...
Страница 359: ...Connect both power cables if there is a redundant power supply Power Switch I O ...
Страница 364: ...Breaker switch I O L N Terminal board Front ...
Страница 369: ... Breaker switch I O Front Rear ...
Страница 384: ......
Страница 386: ... ...
Страница 387: ... ...
Страница 388: ... Anchor screw Guide rail ...
Страница 393: ...2 Follow the instructions illustrated in Figure 8 5 I O DC DC unit power switch ...
Страница 395: ...2 Follow the instruction illustrated in Figure 8 7 I O DC DC unit power switch ...
Страница 398: ...POW 2 Follow the instructions illustrated in Figure 8 10 Using the latches ...
Страница 402: ...To add or remove the fan tray for GR2000 20H follow the instructions illustrated in Figure 8 14 Cover Fan tray ...
Страница 405: ...To add or remove the main memory module for RP follow the instructions illustra in Figure 8 17 Installed connector ...
Страница 410: ......