Component Details
GR2K-GA-1002
3-15
Rev. 6.03
3.3.7
RMB-IO(H)
The RMB-IO(H) for GR2000-6H, GR2000-10H and GR2000-20H (BCU-H850H,
BCU-M850H and BCU-L850H) physically appears as Figure 3-17
Figure 3-17 RMB-IO(H) Front Panel View
3.3.8
CSW
The CSW-L3MH for GR2000-20H, and the CSW-L1M and the CSW-L3M for
GR2000-20 physically appear as Figure 3-18 and Figure 3-19. To explore the LED
display functions, see the
Operations Guide
.
Figure 3-18 CSW-L3MH Front Panel View
Figure 3-19 CSW-L1M and CSW-L3M Front Panel View
Switch and LED indication
Table 3-11 BCU switch and function of LED indications
Nam of
Board
Name of switch
and LED
Switch or LED
Status
Content
CSW
STATUS
(GR2000-4/10)
LED: Green/
Yellow/ Red
Shows the
operating
condition of RM.
Green: Operable operation
Yellow: Blocking and cock insertion and
removal possible.
Green blinking: Under preparation (being
started up.)
Red: Fault
Extinguished: Operation not possible
(Including the device power supply being
turned off)
Ȇ
Ȏ ȏ Ȑ ȇ ȑ
#%
6+
8'
21
9'
4
4'
#&
;
#.
#4
/
'4
41
4
21
56
&+
52
S
TA
T
U
S
CS
W
(LH)
ST
AT
U
S
Содержание GR2000 Series
Страница 1: ...Hitachi Gigabit Router GR2000 Series GR2K GA 1002 Rev 6 03 Installation Guide ...
Страница 26: ...GR2000 Installation Guide xxvi GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 42: ...GR2000 Installation Guide xlii GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 54: ...GR2000 Installation Guide liv GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 102: ...GR2000 Installation Guide 2 46 GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 296: ......
Страница 311: ...Figure 5 12 Airflow of GR2000 4 Out left side In right side In upper left side In upper right side In upper rear end ...
Страница 312: ... n upper eft side In upper right side In upper front end ...
Страница 314: ......
Страница 329: ......
Страница 330: ... ...
Страница 338: ... Metal bracket accessory of rack 19 inch rack Interface cable Power calbe ...
Страница 345: ...19 inch Rack GR2000 10H or GR2000 10 Guide Rail ...
Страница 346: ...Each POW is long and heavy approx 520mm deep 8 kg Hold the handle and support the bottom Removing POW Removing Fan Tray ...
Страница 350: ......
Страница 351: ...547 95 177 8 1430 133 35 177 8 ...
Страница 352: ...Open rack Dedicated guide rail edicated bracket supplied with the evice fitting screws Device fitting screw hole ...
Страница 353: ...19 inch Rack GR2000 20H or GR2000 20 Guide Rail ...
Страница 356: ...Metal fittings supplied as accessories M4 screws supplied as accessories NIF side ...
Страница 359: ...Connect both power cables if there is a redundant power supply Power Switch I O ...
Страница 364: ...Breaker switch I O L N Terminal board Front ...
Страница 369: ... Breaker switch I O Front Rear ...
Страница 384: ......
Страница 386: ... ...
Страница 387: ... ...
Страница 388: ... Anchor screw Guide rail ...
Страница 393: ...2 Follow the instructions illustrated in Figure 8 5 I O DC DC unit power switch ...
Страница 395: ...2 Follow the instruction illustrated in Figure 8 7 I O DC DC unit power switch ...
Страница 398: ...POW 2 Follow the instructions illustrated in Figure 8 10 Using the latches ...
Страница 402: ...To add or remove the fan tray for GR2000 20H follow the instructions illustrated in Figure 8 14 Cover Fan tray ...
Страница 405: ...To add or remove the main memory module for RP follow the instructions illustra in Figure 8 17 Installed connector ...
Страница 410: ......