Table 4-25 shows the accommodation conditions in the same RP in Ethernet.
Table 4-26 shows the accommodation conditions in the same NIF, and
Table 4-27 shows those in the same line.
Functions that can be operated by Ethernet are as follows:
VRRP, MPLS, Tag-VLAN(IPv4) (Note1), Tag-VLAN(IPv6) (Note1), bridge protoco
multihome, IP protocol, IPv6 protocol, IPX protocol, IPv4 multicast, IPv6
multicast, and non- Tag-VLAN.
Table 4-25 Accommodation Conditions in the Same RP and Different NIF
Item
VRRP
MPLS
VLAN (Note 1)
Bridge
Non-VLAN
IP multicast
IPv
VRRP
√
√
√
√
√
√
√
MPLS
√
√
√
√
√
x
x
VLAN(Note 1)
√
√
√
√
√
x
x
Bridge
√
√
√
√
√
√
√
Non-VLAN
√
√
√
√
√
√
√
IP multicast
√
x
x
√
√
√
√
IPv6
√
x
x
√
√
√
√
(Note 1) The number of VLANs is especially limited when VLAN is used. For details, see the "Maximum number
Содержание GR2000 Series
Страница 1: ...Hitachi Gigabit Router GR2000 Series GR2K GA 1002 Rev 6 03 Installation Guide ...
Страница 26: ...GR2000 Installation Guide xxvi GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 42: ...GR2000 Installation Guide xlii GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 54: ...GR2000 Installation Guide liv GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 102: ...GR2000 Installation Guide 2 46 GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Страница 296: ......
Страница 311: ...Figure 5 12 Airflow of GR2000 4 Out left side In right side In upper left side In upper right side In upper rear end ...
Страница 312: ... n upper eft side In upper right side In upper front end ...
Страница 314: ......
Страница 329: ......
Страница 330: ... ...
Страница 338: ... Metal bracket accessory of rack 19 inch rack Interface cable Power calbe ...
Страница 345: ...19 inch Rack GR2000 10H or GR2000 10 Guide Rail ...
Страница 346: ...Each POW is long and heavy approx 520mm deep 8 kg Hold the handle and support the bottom Removing POW Removing Fan Tray ...
Страница 350: ......
Страница 351: ...547 95 177 8 1430 133 35 177 8 ...
Страница 352: ...Open rack Dedicated guide rail edicated bracket supplied with the evice fitting screws Device fitting screw hole ...
Страница 353: ...19 inch Rack GR2000 20H or GR2000 20 Guide Rail ...
Страница 356: ...Metal fittings supplied as accessories M4 screws supplied as accessories NIF side ...
Страница 359: ...Connect both power cables if there is a redundant power supply Power Switch I O ...
Страница 364: ...Breaker switch I O L N Terminal board Front ...
Страница 369: ... Breaker switch I O Front Rear ...
Страница 384: ......
Страница 386: ... ...
Страница 387: ... ...
Страница 388: ... Anchor screw Guide rail ...
Страница 393: ...2 Follow the instructions illustrated in Figure 8 5 I O DC DC unit power switch ...
Страница 395: ...2 Follow the instruction illustrated in Figure 8 7 I O DC DC unit power switch ...
Страница 398: ...POW 2 Follow the instructions illustrated in Figure 8 10 Using the latches ...
Страница 402: ...To add or remove the fan tray for GR2000 20H follow the instructions illustrated in Figure 8 14 Cover Fan tray ...
Страница 405: ...To add or remove the main memory module for RP follow the instructions illustra in Figure 8 17 Installed connector ...
Страница 410: ......