-15-
7. Removal of the roller holder
(1) Remove the two Retaining Rings (E-Type) for D3 Shaft
[52]
from the Pin
[42]
.
(2) Pull out the Needle Roller
[40]
press-fitted in the Gear Holder
[35]
and remove the Roller Holder
[41]
.
(3) Remove the Needle Roller
[40]
from the Gear Holder
[35]
.
8. Removal of the change knob
(1) Remove the Retaining Ring (E-Type) for D5 Shaft
[36]
and remove the Change Knob
[45]
, Spring (C)
[46]
and Steel Ball D3.97
[47]
.
(2) Be careful not to lose Spring (C)
[46]
and the Steel Ball D3.97
[47]
.
• Removal of the roller holder
Gear Holder
[35]
Roller Holder
[41]
Needle Roller
[40]
Pin
[42]
Retaining Ring (E-Type) for D3 Shaft
[52]
• Removal
of the change knob
Steel Ball D3.97
[47]
Spring (C)
[46]
Change Knob
[45]
Retaining Ring (E-Type)
for D5 Shaft
[36]