Operator’s Manual
PRS 80
16
5.4.3 Pre-Operation Inspection
Before operating the crane, the following electrical connections must be checked to ensure that the
system is properly connected for the crane configuration.
With even parts of hoisting line, the weight shall be attached to the dead-end line. With odd parts of
hoisting line, the weight shall be attached to the line of lowest speed.
A separate A2B weight and transmitter must be used for each hoist that is in use. The Retainer flag, if
equipped, must be removed from each switch that is in use. Switches that are not in use should either
be removed from the system or must have the retainer flag installed.
Anti-Two-Block Retainers (optional)
Installation of Anti Two-Block Retainer in Locking Position Procedure (see Fig. 1 and 2):
1. Pull the cable out of the switch and bend back parallel to the boom and hold (1).
2. Slide the retainer from left side with its slot over the cable between the crimped stop and the switch
(2). Push it firmly straight onto the cable guide of the Anti Two-Block switch (3).
Fig. 1
:
Setting of Anti Two-Block Retainer in Locking
Position
Fig. 2
:
Retainer in Locking Position
3. Straighten the cable completely into the slot and release the cable (4).
4. Turn the flag of the retainer for best visibility for the operator (5).
© Hirschmann PRS80 REV. C 09/26/05
190183_D.DOC
Содержание PRS 80
Страница 1: ...www hirschmann com P N 031 300 190 183 Rev D 11 08 10 PRS 80 OPERATOR S SERVICE MANUAL ...
Страница 2: ......
Страница 4: ......
Страница 6: ......