1
Measurement Process
Measurement Process
Installing the software
(
)
Install the RM2612 Resistance Calculation Software on your
computer.
Connecting the
equipment
(
)
•Connect the RM2611 Electrode Resistance Meter to the RM9004
Test Fixture with the RM9005 Connection Cable.
•Connect the RM2611 Electrode Resistance Meter to the computer
with a USB cable.
•Turn on the RM2611 Electrode Resistance Meter.
Completing the pre-start
inspection
Check to ensure the RM2610 Electrode Resistance Measurement
System and optional equipment are not experiencing any
malfunctions or failures.
Configuring settings
“Customizing Measurement Conditions” (p. 51)
Loading the
measurement target
(
)
•
Load the electrode sheet into the RM9003 Press Unit.
Making measurements
“3.9 Checking Measurement Results” (p. 48)
Saving the results
“3.9 Checking Measurement Results” (p. 48)
“6.1 Saving Measurement Conditions” (p. 73)
Completing work
Complete measurement and turn off the system.
10
9
8
7
6
5
4
3
2
1
Index
Содержание RM2610
Страница 2: ......
Страница 12: ...8 Operating Precautions...
Страница 22: ...18 USB License Key and Screens RM2612 Resistance Calculation Software...
Страница 54: ...50 Checking Measurement Results...
Страница 72: ...68 Setting Administrator Mode...
Страница 110: ...106 Under what circumstances do contact errors occur...
Страница 128: ...124 Dimensional Drawings 10 2 Dimensional Drawings RM2611 Electrode Resistance Meter Unit mm...
Страница 130: ...126 Dimensional Drawings RM9005 Connection Cable Unit mm...
Страница 134: ...130 Index...
Страница 135: ......
Страница 136: ......
Страница 137: ......
Страница 138: ......