XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
X.X
XXXX
XXXX
XXXX
XXXX
XXXX
XXX
XXX
XXX
XXX
XXXX
XXX
XXXX
XXXX
XXXX
XXXX
XXXX
Kg
Kg
XXXX
XXXX
XXXX
XXXX
XXXX
XXX
XXXX
XXX Kg
Kg
XXXX
XXXX
XXXX
XXXX
XXXX
XXX
XXXXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XX
XXXX
XXXXXXXX
XXXX
29
Safety precautions and warnings
Operator's Manual GB
3.3.4
Load diagram
The load diagrams are placed on the column and
show the maximum loads your crane / JIB (if
fitted) / hoist (if fitted) may lift in the entire
working zone (manual extensions excluded). The
load diagram drawing will also be found in the
enclosed Technical Data.
The white area is the working zone of the
crane.
The load curves show the maximum load that
may be lifted at a given reach and height. For a
given maximum load, the possible working zone
is to the left of the load curve. The lifting
capacity for some cranes is limited in the high
lifting area.
WARNING
Care must be taken when handling loads in the
high lifting area, so the load/tool does not
come into contact with the boom system.
WARNING
Never operate the hydraulic extensions against
a solid objet when the first boom is completely
lifted. Do not try to push or compress loads
when the first boom is fully lifted, as this
could cause damage to the first boom cylinder.