108
Ending crane operation
Operator's Manual GB
8.1.1
4.
Cranes with S-boom:
Extend the boom
extensions until the catcher
②
drops. Re-
tract the extensions carefully until the
catcher secures the boom. Start to lower the
first boom until the second boom is in
horizontal position.
Other cranes:
Start to lower the first boom
until the second boom is in horizontal
position.
5. Lower the boom system until it is secured
on the parking support.
6. Fold the hook.
HIAB 258/262/298/302
1. Retract the boom extensions completely.
! NOTE
If the crane is equipped with OPS, press and hold
button
on the user panel while carrying out
instructions 2-5.