Procedure
1.
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Disconnect all peripheral cables from the server.
4.
Do one of the following:
Remove the server from the rack
on page 30.
• Server in tower mode:
Position the tower server for hardware configuration
5.
on page 32.
6.
on page 34.
7.
on page 35.
8.
.
9.
Do one of the following:
•
•
Remove the redundant system fan
10.
11.
Remove the energy pack holder.
12.
If installed, remove these server options from the PCIe slot:
Removal and replacement procedures
73
Содержание HPE ProLiant ML110 Gen10
Страница 23: ...Customer self repair 23...
Страница 24: ...24 Customer self repair...
Страница 25: ...Customer self repair 25...
Страница 109: ...Storage controller backup power cabling Energy pack cabling Cabling 109...
Страница 112: ...iLO Service Port cabling Fan cabling Default system fan cabling 112 Cabling...